• Re: Level Boarding

    From boltar@boltar@caprica.universe to uk.railway,uk.transport.london on Sat Oct 24 14:56:31 2026
    From Newsgroup: uk.transport.london

    On Sat, 24 Oct 2026 11:25:06 GMT
    Recliner <recliner.usenet@gmail.com> gabbled:
    <boltar@caprica.universe> wrote:
    If you order trains with longer carraiges and hence a larger throw on a line >> with severe tunnel curves it should hardly have come as a surprise to anyone.


    Yes, I recall that there were problems getting the 73TS into service, but >donrCOt remember what the problems were. They eventually entered passenger >service in July 1975, so the 24TS will probably have a similar delay
    entering service.

    As you say, the carriages for the 1973 stock are longer than other lines,
    so a six-car train is 107.6m (350ft) long, which is only 5.23m (17ft)
    shorter than the seven-car trains (primarily 59TS, with some remaining
    38TS) they replaced. So we ended up with shorter trains, with fewer doors, >but with a larger dynamic loading gauge rCo all because of cost-cutting in a >period of declining demand. The new 24TS trains are 113.63 m (372 ft 9 5/8 >in) long, so very slightly longer than the previous 7-car trains
    (articulated design means they have much more floor space). So part of the >work for the 24TS introduction is to restore the platform lengths.

    I guess you mean the gated off parts + platform monitors will be going?

    xposted to uk.transport.london

    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.transport.london,uk.railway on Sat Oct 24 15:53:18 2026
    From Newsgroup: uk.transport.london

    <boltar@caprica.universe> wrote:
    On Sat, 24 Oct 2026 11:25:06 GMT
    Recliner <recliner.usenet@gmail.com> gabbled:
    <boltar@caprica.universe> wrote:
    If you order trains with longer carraiges and hence a larger throw on a line
    with severe tunnel curves it should hardly have come as a surprise to anyone.


    Yes, I recall that there were problems getting the 73TS into service, but
    donrCOt remember what the problems were. They eventually entered passenger >> service in July 1975, so the 24TS will probably have a similar delay
    entering service.

    As you say, the carriages for the 1973 stock are longer than other lines,
    so a six-car train is 107.6m (350ft) long, which is only 5.23m (17ft)
    shorter than the seven-car trains (primarily 59TS, with some remaining
    38TS) they replaced. So we ended up with shorter trains, with fewer doors, >> but with a larger dynamic loading gauge rCo all because of cost-cutting in a >> period of declining demand. The new 24TS trains are 113.63 m (372 ft 9 5/8 >> in) long, so very slightly longer than the previous 7-car trains
    (articulated design means they have much more floor space). So part of the >> work for the 24TS introduction is to restore the platform lengths.

    I guess you mean the gated off parts + platform monitors will be going?

    Yup. They probably need to refurbish the platform ends that have been
    disused for 50 years