• Bridgewater Canal breach repair moves into contractor procurement

    From Martin Nicholas@reply-2026@mgn.org.uk to uk.rec.waterways on Mon Aug 24 12:02:00 2026
    From Newsgroup: uk.rec.waterways

    "Repair work on the Bridgewater Canal breach at Little Bollington has
    moved into the contractor procurement phase, following the completion
    of survey and design work."

    https://www.newcivilengineer.com/latest/bridgewater-canal-breach-repair-moves-into-contractor-procurement-24-08-2026/

    The forgotten breach.
    --
    Regards,

    Martin Nicholas.

    E-mail: reply-202608@mgn.org.uk (Address will be valid throughout
    August).

    What people think of you is none of your business.

    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Tahiri@tahiri2@tanygraig.force9.co.uk to uk.rec.waterways on Mon Aug 24 20:37:24 2026
    From Newsgroup: uk.rec.waterways

    On 24/08/2026 12:02, Martin Nicholas wrote:
    "Repair work on the Bridgewater Canal breach at Little Bollington has
    moved into the contractor procurement phase, following the completion
    of survey and design work."

    https://www.newcivilengineer.com/latest/bridgewater-canal-breach-repair-moves-into-contractor-procurement-24-08-2026/

    The forgotten breach.

    Why on earth is it taking so long? The Canal and River Trust will have finished both the breaches on th Llangollen before this much earlier one
    is even started!
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From John Williamson@johnwilliamson@btinternet.com to uk.rec.waterways on Mon Aug 24 21:14:01 2026
    From Newsgroup: uk.rec.waterways

    On 24/08/2026 20:37, Tahiri wrote:
    On 24/08/2026 12:02, Martin Nicholas wrote:
    "Repair work on the Bridgewater Canal breach at Little Bollington has
    moved into the contractor procurement phase, following the completion
    of survey and design work."

    https://www.newcivilengineer.com/latest/bridgewater-canal-breach-repair-moves-into-contractor-procurement-24-08-2026/


    The forgotten breach.

    Why on earth is it taking so long? The Canal and River Trust will have finished both the breaches on th Llangollen before this much earlier one
    is even started!

    Partly because while Peel Holdings own the canal, it is operated and maintained by a trust set up in the 1970s after the last breach there.

    This means that just about every job needs approval from three levels of management, one of which would no be unhappy if it were to quietly
    vanish off their books.

    There are also legal problems with access to the ground for the repairs.
    The access roads are not suitable for large vehicles.
    --
    Tciao for Now!

    John.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Martin Nicholas@reply-2026@mgn.org.uk to uk.rec.waterways on Tue Aug 25 11:21:00 2026
    From Newsgroup: uk.rec.waterways

    On Mon, 24 Aug 2026 21:14:01 +0100
    John Williamson <johnwilliamson@btinternet.com> wrote:

    On 24/08/2026 20:37, Tahiri wrote:
    On 24/08/2026 12:02, Martin Nicholas wrote:
    "Repair work on the Bridgewater Canal breach at Little Bollington
    has moved into the contractor procurement phase, following the
    completion of survey and design work."

    https://www.newcivilengineer.com/latest/bridgewater-canal-breach-repair-moves-into-contractor-procurement-24-08-2026/


    The forgotten breach.

    Why on earth is it taking so long? The Canal and River Trust will
    have finished both the breaches on th Llangollen before this much
    earlier one is even started!

    Partly because while Peel Holdings own the canal, it is operated and maintained by a trust set up in the 1970s after the last breach there.

    This means that just about every job needs approval from three levels
    of management, one of which would no be unhappy if it were to quietly
    vanish off their books.

    There are also legal problems with access to the ground for the
    repairs. The access roads are not suitable for large vehicles.



    ...and everyone has forgotten how to make repairs directly from the
    water. In this case, the sheer scale would make this difficult, but
    elsewhere?

    I remember the collapsed culvert (in 2025) on the Shroppie took 40-days
    before even site access was obtained.
    --
    Regards,

    Martin Nicholas.

    E-mail: reply-202608@mgn.org.uk (Address will be valid throughout
    August).

    Cyber-diversity is as important as bio-diversity.

    --- Synchronet 3.22a-Linux NewsLink 1.2