From Newsgroup: uk.rec.waterways
Latest anticipated opening: 12th December.
https://canalrivertrust.org.uk/notices/019817a5-1267-7775-83bb-547ca398a9d1
Timeline so far:
17/7 Leak occurs.
8/9 Work commences. 53 days delay.
12/12 Estimated completion. 128 days total.
Seems to me that BW have forgotten how to make repairs in a timely
manner. Four months to repair a culvert is unacceptable.
Meantime, I read that trapped boaters are getting snotty overstay
notices from the BW computer.
It is reasonable to assume that culvert repair will be an on-going
problem as all the culverts on the system were built at very roughly the
same time. Two or three failures per year is to be expected it would
seem.
--
Regards,
Martin Nicholas.
E-mail:
reply-202510@mgn.org.uk (Address will be valid throughout
October).
Old men are never wrong.