Trip report #3, some thread convergence and closure.
From
Roland Perry@roland@perry.uk to
uk.railway on Sat Nov 14 21:33:55 2026
From Newsgroup: uk.railway
Turns out it wasn't just my room in the hotel overlooking Crewe Station
which had broken heating. It was the whole hotel. In several hundred
hotels I've stayed in over the years, this was a first, although I did encounter two hotels (~45yrs and ~20yrs ago) which had no hot water.
Starting my trip home, the barriers at Crewe station did not accept my
ticket, and the gripper who closely examined it, and let me through
manually, had no idea why.
On the platform, which didn't have much seating, the Gents toilets were
closed for cleaning.
On the plus side, 70000 Britannia trundled through on its way from Crewe
to Carnforth ECS. But because I wasn't wearing my Ray-Bans, by the time
I got my phone out to video it, all I managed to get was a shot of the
diesel on the back.
On LNR to New Street, a very lively ride. And the train was pretty full, albeit because almost every pax had a bag on the seat beside them.
An RPI sprinted through train shouting "tickets from Crewe". Plus two
huge bodyguards. By the time I'd found which pocket my paper ticket was
in, they were miles away. And why the two huge bodyguards?
The train had a "Standard +" compartment, but not clear if this required
a supplementary ticket. None of the pax sat in it (with their bags on
the seat next to them), who I asked, knew. But nobody got collared by
the RPI, so perhaps not.
On-train wifi requires sign-in, but didn't inter-operate with the
Firefox on my laptop. Two power-points per 4-seat table-bay.
Chatted with a lady without a surplus bag, in the next seat (she was
bound for Totnes, change at New St) and asked if she knew what the oft-repeated announcement "doesn't look right" meant. Confessed she had
no idea. I asked her if she could think again, and she came quite close
with "maybe an unaccompanied bag on a seat".
A lot of people have posted fairly negative things about New Street, but
at track level it was as open a space as is possible, given it's in the basement. Large lifts all working, and a massive cross-passage to change trains, with no barriers to impede, several catering opportunities,
waiting areas with plenty of seats, clean toilets, screens with
departures for at least the next 45mins, and so on.
Three-car TurboStar onwards, quite clean but I'm not sure it was
refurbished. No power points, and wifi OK to begin with, but stopped
working by Nuneaton, never to return. Almost got a sniff of EMR wifi at Leicester station, but wasn't there long enough to get any data shifted.
No window blinds on the train, so the combination of low sun and
lineside vegetation causing flashing several times a second, made it
impossible to do any useful work.
Train got bogged down in the vicinity of Ely North junction, and arrived Cambridge 15 late. Which is better than being 14-3/4 mins late. They'd
fixed the lift at Cambridge Central, and I indulged myself with an
electric taxi home, rather than an electric bus.
--
Roland Perry
--- Synchronet 3.22a-Linux NewsLink 1.2