Louis Ohland wrote: http://ps-2.kev009.com/ohland/8590/Testing_90_Power_Supply.html
There was a recent launch excursion. It drove home the importance of attaching your test leads to the correct conductors.
Being a visual guy, I modified some existing images [without AI, I might
add] and included the test values inside the test attachment illustrations.
I need to turbo-diddle a wee bit more and add (+) and (-) next to the
lead attachment points.
Comments will be either incorporated or blithely ignored.
Louis Ohland wrote:
http://ps-2.kev009.com/ohland/8590/Testing_90_Power_Supply.html
There was a recent launch excursion. It drove home the importance of
attaching your test leads to the correct conductors.
Being a visual guy, I modified some existing images [without AI, I might
add] and included the test values inside the test attachment
illustrations.
I need to turbo-diddle a wee bit more and add (+) and (-) next to the
lead attachment points.
Comments will be either incorporated or blithely ignored.
Thanks Louis!
This response appears in the discussion at: http://www.jlaforums.com/viewtopic.php?p=705420915#705420915
| Sysop: | Amessyroom |
|---|---|
| Location: | Fayetteville, NC |
| Users: | 70 |
| Nodes: | 6 (0 / 6) |
| Uptime: | 39:26:41 |
| Calls: | 948 |
| Calls today: | 2 |
| Files: | 1,325 |
| Messages: | 280,644 |