<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>Just another murdoch shit rag
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bnJust another pathetic little murdoch journo's drug
and threatens NSWrCOs green mission Documents sent to CanberraWho gives a flying red fuck if it does ?Just another pathetic little murdoch journo's drug
now put Snowy 2.0rCOs combined cost at closer to $50bn,
making it a classic example of how to not undertake a major project.We'll see...Just because some fool claims something...
October 22, 2026 - 3:11PMThe Australian Business Network2
CommentsListen to this article5 minThe Snowy Hydro project is rapidly
gaining the reputation as an expensive tunnel to nowhere.
The documents sent to the federal government estimate that Malcolm TurnbullrCOs rCL$2bn Snowy 2. 0rCY will cost a massive $50bn, including the cost of transmission infrastructure.Just because some fool claims something...
And it may go higher.Just because some fool claims something...
Worse still, there is no certainty that the project will actuallyMindless bullshit
work.
The massive blowout threatens the entire NSW renewable scheme,Mindless bullshit
particularly as Queensland has disconnectedBullshit it has
and Victoria looks likely to follow, depending on the election result.Mindless bullshit
The original 2017 estimate of then PM Turnbull looks like a back-of-the-envelope calculation for political purposes and does notThere is no cost of transmission involved
appear to have included the essential cost of transmission.
Later, when the project was designed, not enough notice was taken ofBecause nothing can be done about that, fuckwit
the alerts in the early engineering studies, which warned of the
geological hazards in drilling the required 17km tunnel.
Then PM Malcolm Turnbull during a visit to Snowy Hydro inNo one ever said it does
Cooma in August 2017.
Snowy 2.0 is a giant, pumped-hydro battery.
It does not create power.
The electricity will come from western NSW and similar remote areas.Mindless pig ignorant bullshit
About 2000 towers rCo often 60m to 70m high or almost the height of the Sydney Harbour Bridge pylons rCo must be erected on AustraliarCOs prime farming land to transmit power to and from the Snowy Mountains.Mindless pig ignorant bullshit
Last February, in collaboration with Aidan Morrison of the Centre for Independent Studies, I warned that the project cost was exploding andAnd that was just more mindless pig ignorant shit from your stinking arse
could reach $40bn.
At that stage, only about $8bn had been spent.There is no guarantee that your mindless pig ignorant shit doesn't stink> Snowy 2.0 is a classic example of how to not undertake a major
But the costs kept rising and there is no guarantee that $50bn is the
final figure.
Australian construction project.mindless pig ignorant shit
The Italy-based Webuild, which has close links to the CFMEU, won theYou wouldn't know what a skyrcocket was even if it was fired up your arse
tender (originally in a partnership, but the partners were not able to> continue) using a low, fixed tender price.
Once the project started, the costs quickly exploded above that
tender, and Chris Bowen and his energy department, in conjunction with> the government-owned developer Snowy Hydro, agreed to replace a
fixed-price contract with a cost-plus contract.
Any cost-plus contract with the CFMEU involved is a very dangerous
agreement.
After the cost-plus contract was signed, the costs continued to
skyrocket.
The first drilling was conducted from the top of themindless pig ignorant shit
high country with a drill named Florence.
But Florence was simply not suitable for the difficult terrain and had> to be reconstructed.
The new drill, Monica, which was brought in to tackle the difficult
Long Plain Fault Zone.
SafeWork NSW has brought criminal charges against Webuild over
workplace safety issues during that early drilling.
Webuild denies the charges, but undertaking one of AustraliarCOs most
complex projects under the cloud of criminal charges boosts costs. The> centrepiece of the project is the 17km tunnel.
The huge tunnel must pass through about 800m of some of the most
difficult material in the world to drill rCo the so-called Long Plain
Fault Zone. The Florence difficulties started even before it
reached the Long Plain Fault Zone.
It became clear that Florence simply would not have the ability to get> through the fault zone.
And so, a new drill called Monica was ordered to tackle the 800m fault> zone from the bottom.
This drill is clearly better designed for the task, but there is still> no certainty that it will be able to get through the 800m and link
with Florence.
If Monica canrCOt get through the Long Plain Fault Zone, then the whole project will have to be abandoned.
At the point of abandonment, whatever has been spent will be lost.And that is nothing even remotely like $50b
Back in February, the official cost of the Snowy high country part of
the project, including the tunnel, was officially estimated at $12bn rCo approaching three times the original fixed-price contract cost.
With help, Morrison and I picked up that the $12bn was a fiction and
that closer to $18bn was more realistic.
But the escalations have kept coming and the best estimates are around> $25bn.And that is nothing even remotely like $50b
The now increased cost of the transmission towers (also to be rCLCFMEU managedrCY)BULLSHIT
approximately doubles the total cost to at least $50bn.BULLSHIT
EvenBULLSHIT
if completed, with Snowy 2.0 the massive NSW renewables program will
still require large amounts of gas-powered generation to maintain
continuity of supply when power canrCOt be obtained from the wind and
solar facilities.
And because of the delays, coal generation will be required until theNo problem with that
2040s.
NSW is AustraliarCOs largest commercial state, and the dramatic blowoutMore mindless pig ignorant bullshit
of costs at Snowy 2.0 and the high cost and environmental problems
that are emerging in the various renewable zones, plus the
construction of thousands of transmission towers rCo often through prime farmland rCo will make NSW power among the most expensive in the nation.
Renewables were sold to Australians as a cheap way of generatingThere is no right way to do renewable
power, without emissions.
But the Snowy 2.0 disaster now underlines to Australians that
renewables can be cheap, but only if the right plans are put in place.> The proposed plans are a cost disaster.
The combination of Snowy 2.0 and the renewable zones was simply not
the right way to harness renewables
theaustralian.com.au
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
The Australian Business Network
# /This is a reply to pre-filtered & auto edited post/
# /All quoted inputs by kill-file residents have been expunged/
theaustralian.com.au
The typical Murdoch shit-stirrer propaganda fake and mis-info 'news'(?) >outlet.
Read it only if one is not afraid of permanent brain damage. In your
case, Petz dear, it could obviously do no more harm! :-P
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
YAWN!
Snowy 2 is a mega project in an geologically extremely challenging >environment. It is clear that the LNP dream up this scheme more like a >magical solution to sustainable energy alternatives rather that
something well thought out.
A in case of most mega projects cost blow outs are to be expected
specially when the construction runs over quite a number of years due to >unanticipated technical difficulties.
The Australian Business Network
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Sane and rational people immediately recognise why Murdoch's ghouls
squad is so keen on rubbishing the project. Murdoch and his fossil fuels >pushing billionaire mates don't want any alternative energy projects >succeeding at all. It is as simple as that!
NEXT!
When Turnbull gave the go ahead the tunneling part of Snowy 2. was
cost at under $2 billion.
Now under Albanese Labor the project so far has cost $25 billion
with tunneling not through the hardest geological part
While initiated under the Turnbull Coalition government, the massive escalations and project resets have unfolded during the Albanese Labor government,
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
Corse it will
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
Corse it will
Major fail was from beginning
The potentail--- Synchronet 3.22a-Linux NewsLink 1.2
Original Snowy Mountains Scheme: approximately 4,100 MW of generating capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
# /This is a reply to pre-filtered & auto edited post/
# /All quoted inputs by kill-file residents have been expunged/
|urd||g
Petz
theaustralian.com.au
The typical Murdoch shit-stirrer propaganda fake and mis-info 'news'(?)
outlet.
Read it only if one is not afraid of permanent brain damage. In your
case, Petz dear, it could obviously do no more harm! :-P
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
YAWN!When Turnbull gave the go ahead the tunneling part of Snowy 2. was
Snowy 2 is a mega project in an geologically extremely challenging
environment. It is clear that the LNP dream up this scheme more like a
magical solution to sustainable energy alternatives rather that
something well thought out.
A in case of most mega projects cost blow outs are to be expected
specially when the construction runs over quite a number of years due to
unanticipated technical difficulties.
The Australian Business Network
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Sane and rational people immediately recognise why Murdoch's ghouls
squad is so keen on rubbishing the project. Murdoch and his fossil fuels
pushing billionaire mates don't want any alternative energy projects
succeeding at all. It is as simple as that!
NEXT!
cost at under $2 billion.
Now under Albanese Labor the project so far has cost $25 billion with tunneling not through the hardest geological part
When Turnbull gave the go ahead the tunneling part of Snowy 2. was
cost at under $2 billion.
Now under Albanese Labor the project so far has cost $25 billion with
tunneling not through the hardest geological part
BULLSHIT!
Stop sucking up all that anti-Labor rubbish rhetoric spread around by
the Murdoch outlets, Petz dear!
|urd||g
PetzTurnbull was not Labor Party but in todays world he would be.
When Turnbull gave the go ahead the tunneling part of Snowy 2. was
cost at under $2 billion.
Now under Albanese Labor the project so far has cost $25 billion with
tunneling not through the hardest geological part
BULLSHIT!
Stop sucking up all that anti-Labor rubbish rhetoric spread around by
the Murdoch outlets, Petz dear!
You believe Alabanese Labor is Labour party?
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
Turnbull was not Labor Party but in todays world he would be.
You believe Alabanese Labor is Labour party?
Petzl <petzlx@gmail.com> wroteThat $50b is straight from that fool's arse
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>From Chatbot....
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a> complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle> itself. Additional electricity is lost when transmitting power through> the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.But will be paying for Snowy 2.0 right now
Peter Jason <pj@jostle.com> wrote
Petzl <petzlx@gmail.com> wrote
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23u25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75u77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
That $50b is straight from that fool's arse
Fugg; old people are lucky; they're gonna die soon.
But will be paying for Snowy 2.0 right now
Rod Speed <rod.speed.aaa@gmail.com> wroteIts nothing even remotely like that money
Peter Jason <pj@jostle.com> wroteFor all that money we might invest in a nuclear option.
Petzl <petzlx@gmail.com> wroteThat $50b is straight from that fool's arse
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>From Chatbot....
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>> at closer to $50bn, making it a classic example of how to not
undertake a major project.
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project>>> designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.>>> For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.But will be paying for Snowy 2.0 right now
Petzl <petzlx@gmail.com> wrote
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
Corse it will
Major fail was from beginning
Irrelevant to whether the completed pumped-hydro
scheme will deliver long-term net benefit
The potentail
Original Snowy Mountains Scheme: approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
Petzl <petzlx@gmail.com> wrote
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
Corse it will
Major fail was from beginning
Irrelevant to whether the completed pumped-hydro
scheme will deliver long-term net benefit
--The potentail
Original Snowy Mountains Scheme: approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
On Thu, 22 Oct 2026 18:40:16 +1100, Petzl <petzlx@gmail.com> wrote:
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23u25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75u77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and >generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle >itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.
Peter Jason <pj@jostle.com> wrote
Petzl <petzlx@gmail.com> wrote
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23u25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75u77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
That $50b is straight from that fool's arse
Fugg; old people are lucky; they're gonna die soon.
But will be paying for Snowy 2.0 right now
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
with Energy Minister Chris Bowen describing the blowouts
as "very disappointing" while maintaining that the completed
pumped-hydro scheme will deliver long-term net benefit
Corse it will
Major fail was from beginning
Irrelevant to whether the completed pumped-hydro
scheme will deliver long-term net benefit
In denial again the 2017 deal $2 billion was born to fail,
looked like a scam then.
Snowy 2.0 was not simply unlucky.
The engineering warnings were there early.
SMEC engineers wanted more geotechnical drilling
because they were concerned about the tunnel routeand warned a boring machine could become stuck.
Snowy rejected that advice, then announced the project at about $2
billion in 2017.
That is not a scam in the criminal sense,
but it is a failure of due diligence,
honest costing
and project governance.
Governments should
not announce multibillion-dollar projects on optimistic headline
figures when their own engineers are asking for more investigation.
--- Synchronet 3.22a-Linux NewsLink 1.2The potentail
Original Snowy Mountains Scheme: approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
On Sat, 24 Oct 2026 09:23:45 +1100, "Rod Speed"
<rod.speed.aaa@gmail.com> wrote:
Peter Jason <pj@jostle.com> wrote
Petzl <petzlx@gmail.com> wrote
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>>> mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23u25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75u77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
That $50b is straight from that fool's arse
Fugg; old people are lucky; they're gonna die soon.
But will be paying for Snowy 2.0 right now
For all that money we might invest in a nuclear option.
Peter Jason <pj@jostle.com> wroteThat is nothing like the currently being built by the poms cost
Petzl <petzlx@gmail.com> wroteReality
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>From Chatbot....
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and>> generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity>> when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.
The potentail after it's own energy requirements
Original Snowy Mountains Scheme:
approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
Based on current energy economic modeling and recent international benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
station in Australia is estimated to cost between A$39.6 billion and
A$60.5 billion.
Because Australia lacks an established domestic nuclear industry,Not when you just copy the design of what is clearly
aligns perfectly with what economists call a "First-of-a-Kind" (FOAK) premium,
which factors in the extreme expense of importing foreignThat's bullshit too given we wouldn't have
expertise, engineering crews, and specialized supply chains from
countries like the US or the UK.
Time from start to finnish/operating a Large (2.3GW) Nuclear power
station exceeds 15 years.
For all that money we might invest in a nuclear option.
Its nothing even remotely like that money
and the one the poms are currently building
is costing much more than $50b and jusf one
of those isn'f going go work here because
everyone who has nuke power generation
has more than just one of them
Petzl <petzlx@gmail.com> wrote
Peter Jason <pj@jostle.com> wrote
Petzl <petzlx@gmail.com> wrote
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>>> mission Documents sent to Canberra now put Snowy 2.0As combined cost
at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23u25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75u77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through
the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.
Reality
The potentail after it's own energy requirements
Original Snowy Mountains Scheme:
approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
Based on current energy economic modeling and recent international
benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
station in Australia is estimated to cost between A$39.6 billion and
A$60.5 billion.
That is nothing like the currently being built by the poms cost
And it makes no sense to build a nuke of the same capacity
as Snowy 2.0. what should be built is the capacity that makes
sense for us nuke wise
Because Australia lacks an established domestic nuclear industry,
aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
premium,
Not when you just copy the design of what is clearly
working fine in one of the foreign nukes
In spades when you get those to built it to make one for us
which factors in the extreme expense of importing foreign
expertise, engineering crews, and specialized supply chains from
countries like the US or the UK.
Time from start to finnish/operating a Large (2.3GW) Nuclear power
station exceeds 15 years.
That's bullshit too given we wouldn't have
to do the stupid stuff that the EU mandates
It didnt take France of the poms or the yanks
anything even remotely like that long to build
the first of theirs of that generating capacity
SMEC engineers wanted more geotechnical drilling
And it is far from clear that that would have ensured no problem
Peter Jason <pj@jostle.com> wroteThat stupid number is straight from the arse
Rod Speed <rod.speed.aaa@gmail.com> wroteThat's the question what will it cost to complete Snowy 2
Peter Jason <pj@jostle.com> wroteFor all that money we might invest in a nuclear option.
Petzl <petzlx@gmail.com> wroteThat $50b is straight from that fool's arse
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>From Chatbot....
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs >>>>> green
mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
undertake a major project.
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.>>>> An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the>>>> facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.But will be paying for Snowy 2.0 right now
Supposedly another $30 billion.
A Nuclear power alternative will cost A$60.5 billionThat number is straight from your arse
and take at least from start 15 years to completeMore mindless bullshit from you
Based on current energy economic modeling and recent international benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear powerNothing even remotely like the cost of what the poms are building
station in Australia is estimated to cost between A$39.6 billion and
A$60.5 billion.
Because Australia lacks an established domestic nuclear industry,Like I said, the obvious approach would be to get
aligns perfectly with what economists call a "First-of-a-Kind" (FOAK) premium, which factors in the extreme expense of importing foreign
expertise, engineering crews, and specialized supply chains from
countries like the US or the UK.
Time from start to Finnish/operating a Large (2.3GW) Nuclear powerBecause of the stupid detail the EU fuckwits have imposed on them
station exceeds 15 years.
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
For all that money we might invest in a nuclear option.
Its nothing even remotely like that money
and the one the poms are currently building
is costing much more than $50b and jusf one
of those isn'f going go work here because
everyone who has nuke power generation
has more than just one of them
And it's not the first the UK have built, so cheaper and quicker than
a first of it's kind (FOIK) which is what Australia's would as
everything needed included overseas teams needed to build and run it
would be imported
Rod Speed <rod.speed.aaa@gmail.com> wroteDoesn't have to be that here
Petzl <petzlx@gmail.com> wroteNot a "First-of-a-Kind" (FOAK) there, will be here
Peter Jason <pj@jostle.com> wroteThat is nothing like the one currently being built by the poms cost
Petzl <petzlx@gmail.com> wroteReality
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>From Chatbot....
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs >>>>> green
mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
undertake a major project.
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.>>>> An important distinction: the 25% is the loss within the storage cycle
itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the>>>> facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.
The potentail after it's own energy requirements
Original Snowy Mountains Scheme:
approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
Based on current energy economic modeling and recent international
benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
station in Australia is estimated to cost between A$39.6 billion and>>> A$60.5 billion.
There is no failure, just a cost increaseAnd it makes no sense to build a nuke of the same capacitySort of agree Snowy 2 failure
as Snowy 2.0. what should be built is the capacity that makes
sense for us nuke wise
has been because ofThat didn't happen either
"dumb as a door knob types" overriding experts
like those alreadyWho were never involved in any tunnel boring
working for the Snowy mountains scheme.
They pointed this out in 2017.They actually CLAIMED that, a different matter entirely
Wrong with running it, ours can train on the pom"First-of-a-Kind" (FOAK) even teams to build and run it will have toBecause Australia lacks an established domestic nuclear industry,Not when you just copy the design of what is clearly
aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
premium,
working fine in one of the foreign nukes
be imported,
then there is "miles" of governmentlegislation that has to be > implemented.Which costs peanuts
Again, we don't have to do it like thatIn spades when you get those to built it to make one for usAgain "First-of-a-Kind" (FOAK) scenario.
which factors in the extreme expense of importing foreignThat's bullshit too given we wouldn't have
expertise, engineering crews, and specialized supply chains from
countries like the US or the UK.
Time from start to finnish/operating a Large (2.3GW) Nuclear power
station exceeds 15 years.
to do the stupid stuff that the EU mandates
It didnt take France of the poms or the yanks
anything even remotely like that long to build
the first of theirs of that generating capacity
On Sat, 24 Oct 2026 12:43:41 +1100, "Rod Speed"
<rod.speed.aaa@gmail.com> wrote:
Petzl <petzlx@gmail.com> wroteNot a "First-of-a-Kind" (FOAK) there, will be here
Peter Jason <pj@jostle.com> wrote
Petzl <petzlx@gmail.com> wrote
<https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
https://tinyurl.com/bdcpuaff
TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green
mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
undertake a major project.
From Chatbot....
**Hello, what is the purpose of "Snowy-2" project in NSW?**
The Snowy 2.0 project is a major Australian renewable energy project
designed to store electricity and supply power when people and
businesses need it most.
**Thanks, what is the % energy loss in pumping water uphill?**
ChatGPT said:
For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
complete pumping-and-generation cycle. That corresponds to roughly
75rCo77% round-trip efficiency in published project modelling.
For example:
Stage
Electricity
Electricity used to pump water uphill
100 kWh
Electricity recovered when water flows downhill
75 kWh
Energy lost
25 kWh (25%)
The losses occur because of inefficiencies in the pumps, turbines and
generators, as well as friction as water flows through the tunnels.
An important distinction: the 25% is the loss within the storage cycle >>>> itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
final consumer can be higher.
The project can still be useful because it stores surplus electricity
when demand is low and releases it when demand is high. The key
question is whether the value of that electricity at peak times
outweighs the cost of the energy lost and the cost of operating the
facility.
"...still be useful??" For 50billion$
Fugg; old people are lucky; they're gonna die soon.
Reality
The potentail after it's own energy requirements
Original Snowy Mountains Scheme:
approximately 4,100 MW of generating
capacity.
Snowy 2.0 adds 2,200 MW.
Combined total: about 6,300 MW.
2,000 MW is in the same ballpark as a large nuclear power plant.
Based on current energy economic modeling and recent international
benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
station in Australia is estimated to cost between A$39.6 billion and
A$60.5 billion.
That is nothing like the currently being built by the poms cost
Sort of agree Snowy 2 failure has been because of
And it makes no sense to build a nuke of the same capacity
as Snowy 2.0. what should be built is the capacity that makes
sense for us nuke wise
"dumb as a door knob types" overriding experts like those already
working for the Snowy mountains scheme.
They pointed this out in 2017.
"First-of-a-Kind" (FOAK) even teams to build and run it will have to
Because Australia lacks an established domestic nuclear industry,
aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
premium,
Not when you just copy the design of what is clearly
working fine in one of the foreign nukes
be imported, then there is "miles" of government legislation that has
to be implemented.
Again "First-of-a-Kind" (FOAK) scenario.
In spades when you get those to built it to make one for us
which factors in the extreme expense of importing foreign
expertise, engineering crews, and specialized supply chains from
countries like the US or the UK.
Time from start to finnish/operating a Large (2.3GW) Nuclear power
station exceeds 15 years.
That's bullshit too given we wouldn't have
to do the stupid stuff that the EU mandates
It didnt take France of the poms or the yanks
anything even remotely like that long to build
the first of theirs of that generating capacity
--
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
It's not as though a disposition as predilection for child pornographywhat
is suddenly acquired -- perhaps life circumstances changed which granted accessibility and permissibility.
But the question I have relates to behavioural compensation for the conjectural scenario: "LITTLE MISS MARKLE RAISED TO BE DADDY'S LITTLE PRINCESS" and whether the adverse conduct directed towards the BRITISH ROYALTY is then a consequence --
1) an initial positive, ethical choice: marry a real life titled prince
2) grants a kind of 'moral permission' or 'self-licensing' to
subsequently indulge in a less sustainable behavior: slander of the
ROYAL HOUSEHOLD
Behavioral Compensation is a psychological mechanism that occurs when an individual makes an initial positive, ethical choice. It is the internal mechanism that grants a kind of 'moral permission' or 'self-licensing'
to subsequently indulge in a less sustainable behavior. This process operates beneath the surface of conscious thought, often nullifying the environmental benefits of the first action. The true impact of our
efforts toward a better life and planet often gets eroded by this very
human tendency to balance the scales of our personal goodness.
Understanding this concept is essential for anyone starting their path
in sustainable living, as it shifts the focus from simple good deeds to
the systemic consistency of daily life.
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
SMEC engineers wanted more geotechnical drilling
And it is far from clear that that would have ensured no problem
Their expertise was tunnels and geology of the Snowy scheme
as well as tunnel boring machines
Sydney is full of tunnel boring machines
with zero mistakes over a hundredmiles of bored tunnels in Australia.
It's not as though a disposition as predilection for child pornography--
is suddenly acquired -- perhaps life circumstances changed which granted accessibility and permissibility.
But the question I have relates to behavioural compensation for the conjectural scenario: "LITTLE MISS MARKLE WAS RAISED TO BE DADDY'S LITTLE PRINCESS" and whether the adverse conduct directed towards the BRITISH ROYALTY is then a consequence --
1) an initial positive, ethical choice: marry a real life titled prince
2) grants a kind of 'moral permission' or 'self-licensing' to
subsequently indulge in a less sustainable behavior: slander of the
ROYAL HOUSEHOLD
Behavioral Compensation is a psychological mechanism that occurs when an individual makes an initial positive, ethical choice. It is the internal mechanism that grants a kind of 'moral permission' or 'self-licensing'
to subsequently indulge in a less sustainable behavior. This process operates beneath the surface of conscious thought, often nullifying the environmental benefits of the first action. The true impact of our
efforts toward a better life and planet often gets eroded by this very
human tendency to balance the scales of our personal goodness.
Understanding this concept is essential for anyone starting their path
in sustainable living, as it shifts the focus from simple good deeds to
the systemic consistency of daily life.
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
as Snowy 2.0. what should be built is the capacity that makes
sense for us nuke wise
Sort of agree Snowy 2 failure
There is no failure, just a cost increase
has been because of
"dumb as a door knob types" overriding experts
That didn't happen either
rod speed's an old liarIt didnt take France of the poms or the yanksAgain "First-of-a-Kind" (FOAK) scenario.
anything even remotely like that long to build
the first of theirs of that generating capacity
as well as tunnel boring machines
The original Snowy scheme never ever
used ANY tunnel boring machines so
there was no expertise with those at all
Sydney is full of tunnel boring machines
The geology of Sydney is completely different to the snowy
Rod Speed <rod.speed.aaa@gmail.com> wroteGet fucked
Petzl <petzlx@gmail.com> wroteread it
Rod Speed <rod.speed.aaa@gmail.com> wroteThere is no failure, just a cost increase
as Snowy 2.0. what should be built is the capacity that makesSort of agree Snowy 2 failure
sense for us nuke wise
has been because ofThat didn't happen either
"dumb as a door knob types" overriding experts
<https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf> Yes, the primary documents containing these initial expert warningsThey were nothing even remotely like experts
are available to the public.
When Malcolm Turnbull anouced it (https://www.google.com/search?kgmid=%2Fm%2F01tpld&q=Malcolm+Turnbull) announced the $2 billion preliminary estimate in March 2017, SnowyWhich says nothing even remotely like the shit and lies you spew
Hydro commissioned the Snowy Mountains Engineering Corporation
(SMEC)rCothe original engineering firm behind the historical Snowy
Mountains SchemerCoto conduct the official project analysis. [1]Wota fucking surprise
(https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf), [2]
(https://www.afr.com/companies/energy/announcement-fever-blamed-for-snowy-2-0-cost-debacle-20261023-p6180p),Just another murdoch shit rag that never has a fucking clue
[3]
(https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),Just another rabid lefty shit rag that hates the libs
[4] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)Just some grandstanding irrelevant clown
The original warnings and data can be tracked down through theseFrom those who were never anything even remotely
specific avenues:
1. The SMEC Snowy 2.0 Feasibility Study (December 2017)
The core engineering warnings originated here.
The study explicitly stated that the $2 billion figure was highly > unrealistic,Irrelevant to your stupid ignorant claim about failure
recalculating the baseline cost immediately to between $3.8 billionSo they completely fucked that up too
and $4.5 billion.
Crucially, SMEC engineers explicitly warned about:No news and they completely fucked up their calculation too
[1] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [2] (https://www.linkedin.com/posts/chiefindustryoptimist_how-malcolm-turnbull-thought-snowy-20-could-activity-7519200702041112576-VGLO)
rCo Extreme Geological Volatility: Tunnelling through 30 different types
of rock and three major active fault lines (including the high-risk
Long Plain Fault Zone). [1]
(https://www.facebook.com/EngineersAustralia/videos/hydro-heaven/28660325236984873/)Wota surprise and they completely fucked up their calculation too
rCo Lack of Data: A stark warning that there was "insufficient
geotechnical drilling" conducted prior to contract finalization. They
noted that without deeper drilling, tunnel boring machines (TBMs)
risked getting stuck in unmapped soft ground and fissures. [1]
(https://www.news24.com.au/business/energy/snowy-hydro-20-likely-less-than-halfway-complete-expert-warns-after-damning-report-It was in fact nothing even remotely like that and
[2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)Which says nothing like you stupidly claim
rCo Where to access it: The full, multi-volume Snowy 2.0 Feasibility
Study and Business Cases are hosted publicly on the official Snowy
Hydro Documents Portal. [1] (https://www.snowyhydro.com.au/snowy-20/documents/)
2. The Geotechnical and Environmental Impact Statements (EIS)And they completely fucked up their calculation too
As the engineers predicted, the lack of initial site proofing led to
severe contract failures, including the Tunnel Boring Machine Florence> famously getting trapped in soft mud and causing a massive 9-metre
deep environmental sinkhole. [1]
(https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/),Wota surprise because the tunnelling machine had not be replaced yet
[2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [3] (https://www.abc.net.au/news/2023-10-23/snowy-hydro-sinkhole-toxic-gas-tunnelling-four-corners/102995568)Easy to be wise after the fucking event
rCo Where to access it: The extensive engineering and 383-page
Geotechnical Remediation Reports detailing these exact contract and
drilling failures are available publicly via the NSW Major Projects
Planning Portal, filed under the Snowy 2.0 Main Works modifications.
[1] (https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/)
3. The Australian National Audit Office (ANAO) Reports
For a high-level critique of how Snowy Hydro executives managed the engineering contracts and why they ignored early warning signs, theWhich is nothing even remotely like your stupid $50b claim
federal auditor has published independent reports. [1] (https://www.abc.net.au/news/2026-06-18/auditors-say-snowy-2-0-not-holding-contractors-accountable/106700336),
[2] (https://www.hancockenergy.com.au/snowy-hydro-blame-game-erupts-amid-cost-blowout-tensions/)
rCo Where to access it: You can read the independent breakdown of the project's flawed delivery model directly on the ANAO Report No. 33 of 2021rCo22 page. [1] (https://www.anao.gov.au/work/performance-audit/snowy-20-governance-early-implementation)
Note: Following the exact risks the SMEC engineers warned about, the
contract had to be completely re-negotiated from a performance-based
contract to a "cost-plus" model, and the total projected cost has
ballooned from the initial $2 billion to an estimated $22 billionrCo$25 billion. [1]
(https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),Just another rabid lefty shit rag that hates the libs
[2] (https://www.facebook.com/theaustralian/posts/snowy-hydros-board-investigated-sacking-the-lead-contractor-building-australias-/1552765453554982/),Just some grandstanding irrelevant clown
[3] (https://au.news.yahoo.com/snowy-2-0-could-cost-212957212.html)Just some fuckwit journo
He is avoiding that a Nuclear Power pant is just part of a complex
proccess.
before it starts Government will need legislation authorising it
and dispoale,
stock piles roads emergency and it goes on.
They do not just come in a Weetbix box.
Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
as well as tunnel boring machines
The original Snowy scheme never ever
used ANY tunnel boring machines so
there was no expertise with those at all
Sydney is full of tunnel boring machines
The geology of Sydney is completely different to the snowy
Doubt if any of the Snowy engineers are still alive.
These engineers would be today's
and familiar with Tunnel Boring Machines
psychological mechanism?
Quite rightly so -- when does miss markle cease being the actress ...
It's only a hypothetical question since she might have lived with her
father after 9yo ...
What is the psychological mechanism of a perceived internal state which controls outward action and statements--is it natural or a coerced disposition?
Newsgroup Evil <Evil@Hell.biz> wrote:
It's not as though a disposition as predilection for child pornography
is suddenly acquired -- perhaps life circumstances changed which granted
accessibility and permissibility.
But the question I have relates to behavioural compensation for the
conjectural scenario: "LITTLE MISS MARKLE WAS RAISED TO BE DADDY'S LITTLE >> PRINCESS" and whether the adverse conduct directed towards the BRITISH
ROYALTY is then a consequence --
1) an initial positive, ethical choice: marry a real life titled prince
2) grants a kind of 'moral permission' or 'self-licensing' to
subsequently indulge in a less sustainable behavior: slander of the
ROYAL HOUSEHOLD
Behavioral Compensation is a psychological mechanism that occurs when an
individual makes an initial positive, ethical choice. It is the internal
mechanism that grants a kind of 'moral permission' or 'self-licensing'
to subsequently indulge in a less sustainable behavior. This process
operates beneath the surface of conscious thought, often nullifying the
environmental benefits of the first action. The true impact of our
efforts toward a better life and planet often gets eroded by this very
human tendency to balance the scales of our personal goodness.
Understanding this concept is essential for anyone starting their path
in sustainable living, as it shifts the focus from simple good deeds to
the systemic consistency of daily life.
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Sydney is full of tunnel boring machines
The geology of Sydney is completely different to the snowy
Doubt if any of the Snowy engineers are still alive.
Some are, but they certainly don't work for SMEC anymore
These engineers would be today's
Duh
and familiar with Tunnel Boring Machines
Bullshit given that the SMEC has never ever done any of that
They haven't even done any dam construction
either for more than 50 fucking years
Rod Speed <rod.speed.aaa@gmail.com> wrote<<> Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
Sydney is full of tunnel boring machines
The geology of Sydney is completely different to the snowy
Doubt if any of the Snowy engineers are still alive.
Some are, but they certainly don't work for SMEC anymore
These engineers would be today's
Duh
and familiar with Tunnel Boring Machines
Bullshit given that the SMEC has never ever done any of that
They haven't even done any dam construction
either for more than 50 fucking years
SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle tunnelling and underground infrastructure services,
including specialized expertise in Tunnel Boring Machines (TBMs)
|urd||g
PetzTurnbull was not Labor Party but in todays world he would be.
When Turnbull gave the go ahead the tunneling part of Snowy 2. was
cost at under $2 billion.
Now under Albanese Labor the project so far has cost $25
billion with tunneling not through the hardest geological part
BULLSHIT!
Stop sucking up all that anti-Labor rubbish rhetoric spread around by
the Murdoch outlets, Petz dear!
You believe Alabanese Labor is Labour party?
--
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Dolf's using the following header:--
Petzl <petzlx@gmail.com> wrote
Rod Speed <rod.speed.aaa@gmail.com> wrote<<> Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
Sydney is full of tunnel boring machines
Bullshit
The geology of Sydney is completely different to the snowy
Doubt if any of the Snowy engineers are still alive.
Some are, but they certainly don't work for SMEC anymore
These engineers would be today's
Duh
and familiar with Tunnel Boring Machines
Bullshit given that the SMEC has never ever done any of that
They haven't even done any dam construction
either for more than 50 fucking years
SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle
tunnelling and underground infrastructure services,
Bullshit given that they haven't done any tunnelling for 55 years
And they aren't even doing the current snowy
2.0 tunnel boring, it's contracted out to dagos
including specialized expertise in Tunnel Boring Machines (TBMs)
You have never had a fucking clue
However, I have always asserted that Labor has drifted towards the
political right, and that already for decades. Having said that, it
still stands for the interest of the wage slave class, but just barely!
Turnbull was not Labor Party but in todays world he would be.
Hmmm. Not quite, even if we acknowledge that the whole political
spectrum with the exception of the far-left has a nasty right shift.
Turnbull was and apparently still is a *small 'l'* liberal with
neo-liberal economic views.
I suppose Labor has moved a little bit closer to his position on the political right.
Dolf's using the following header:
Rod Speed <rod.speed.aaa@gmail.com> wroteWhich involves no SMEC engineers
Petzl <petzlx@gmail.com> wroteYes the tunnel boring company is called SalamiImpregnation known here > as Webuild
Rod Speed <rod.speed.aaa@gmail.com> wrote<<> Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
BullshitPetzl <petzlx@gmail.com> wrote
Sydney is full of tunnel boring machines
Bullshit given that they haven't done any tunnelling for 55 yearsSMEC (Snowy Mountains Engineering Corporation) delivers full lifecycleSome are, but they certainly don't work for SMEC anymoreThe geology of Sydney is completely different to the snowyDoubt if any of the Snowy engineers are still alive.
These engineers would be today'sDuh
and familiar with Tunnel Boring MachinesBullshit given that the SMEC has never ever done any of that
They haven't even done any dam construction
either for more than 50 fucking years
tunnelling and underground infrastructure services,
And they aren't even doing the current snowy
2.0 tunnel boring, it's contracted out to dagos
which Turnbull was warned about by SMEC(Snowy Mountains Engineering > Corporation)Turnbull didn't decide who got the contract
which have been found at the cost of tens ofNothing to do with who got the contract, everything
$billions to of been 100% correct and still rising.
https://share.google/aimode/SewPrqtB9iMqlLaX8Those didn't predict a multi billion price increase
Snowy 2.0rCothe multi-billion-dollar pumped hydro expansion project spearheaded by former Prime Minister Malcolm Turnbull
rCohave materialized as predicted by early independent engineering and geological assessments.
Rigorous warnings regarding the immature design, severe subterraneanThe predicted cost escalation was nothing
fault zones, and highly optimistic pricing have proven precise,
resulting in monumental cost escalations.
--- Synchronet 3.22a-Linux NewsLink 1.2including specialized expertise in Tunnel Boring Machines (TBMs)You have never had a fucking clue
The Newsgroup Devil <Devil@Hell.biz> wrote
However, I have always asserted that Labor has drifted towards the
political right, and that already for decades. Having said that, it
still stands for the interest of the wage slave class, but just barely!
All as dumb as a doorknob, maybe even dumber than doorknobs, the
coalition no better.
One Nations only good will be to remove them,
but doesn't mean she will be better, just hard to believe, but not impossible that she
could be worse.
Petzl <petzlx@gmail.com> wrote
The Newsgroup Devil <Devil@Hell.biz> wrote
However, I have always asserted that Labor has drifted towards the
political right, and that already for decades. Having said that, it
still stands for the interest of the wage slave class, but just barely!
All as dumb as a doorknob, maybe even dumber than doorknobs, the
coalition no better.
One Nations only good will be to remove them,
Nof going to happen, you watch
but doesn't mean she will be better, just hard to believe, but not
impossible that she
could be worse.
In fact given they can't even model what they propose will do,
a fucking sight worse in fact
Rod Speed <rod.speed.aaa@gmail.com> wroteNot a hope in hell given they have only managed
Petzl <petzlx@gmail.com> wroteMaybe?
The Newsgroup Devil <Devil@Hell.biz> wroteNof going to happen, you watch
However, I have always asserted that Labor has drifted towards theAll as dumb as a doorknob, maybe even dumber than doorknobs, the
political right, and that already for decades. Having said that, it>>>> still stands for the interest of the wage slave class, but just >>>> barely!
coalition no better.
One Nations only good will be to remove them,
If it doesn'tMore fool you, it will survive it fine, you watch
Our Australian commonwealth has survived numerous recessions, one
major depression, and two world wars.
Doubt if it will survive under a Albanese Labor Government.
We will do fine without it, but it would certainlyHanson's babbling, like Nuclear power iswhat we need without > mentioning the cost.but doesn't mean she will be better, just hard to believe, but notIn fact given they can't even model what they propose will do,
impossible that she could be worse.
a fucking sight worse in fact
The cheapest option and correct one was and still is to replace ourMakes more sense to have a couple of nukes
old technology coal fired steam power houses with modern millennium
new ones.
Australia will never get nuclear powered Submarines from the yanksWe'll see...
and we don't need them.Correct
Diesel Submarines are sutible, can be bought from Germans or JapaneseAnd are no use to us whatever
very high tech and invisable underwater.
Israel ordered in 2012, initially launched in 2017They don't need them either
Next-Generation Dakar-Class Submarines:rCo Order to Delivery: Ordered in January 2022 with construction starting in late 2024, and projected to> enter active service in the early 2030s (an estimated 9+ yearWe have no need for any subs
development and build cycle).
Our Australian commonwealth has survived numerousrecessions, one major depression, and two world wars.
Doubt if it will survive under a Albanese Labor Government.
I met a chap the other month and gave him some DOCTOR SHOCK KNEE
STABILISERS x 2 for his crippling arthritis and cavalier approach to
medical intervention (ie. turned away from scheduled surgery due to intoxicated larrikan culture).
Would USMAN recommend the "missionary position" in those crippling
arthritic knee circumstances or does he just turn his back towards any discomfort--pray tell?
Usman Khawaja reveals illness he kept secret his entire Test cricket career
Usman Khawaja was just 22 and revelling in being part of the New South
Wales cricket team when he was diagnosed with a potentially crippling disease that he would keep secret his whole career.
Read in ABC News: <https://apple.news/A_jAmalsbTfKqcB3qC_GbQQ>
Can go and fuck itself!
/snip bucket loads of copy and paste Murdoched shit/
Petzl <petzlx@gmail.com> wroteVastly better GWh than all the batterys combined
Rod Speed <rod.speed.aaa@gmail.com> wroteWhich involves no SMEC engineers
Petzl <petzlx@gmail.com> wroteYes the tunnel boring company is called SalamiImpregnation known here >> as Webuild
Rod Speed <rod.speed.aaa@gmail.com> wrote<<> Rod Speed <rod.speed.aaa@gmail.com> wrote
Petzl <petzlx@gmail.com> wrote
BullshitPetzl <petzlx@gmail.com> wrote
Sydney is full of tunnel boring machines
Bullshit given that they haven't done any tunnelling for 55 yearsSMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle >>>> tunnelling and underground infrastructure services,Some are, but they certainly don't work for SMEC anymoreThe geology of Sydney is completely different to the snowyDoubt if any of the Snowy engineers are still alive.
These engineers would be today'sDuh
and familiar with Tunnel Boring MachinesBullshit given that the SMEC has never ever done any of that
They haven't even done any dam construction
either for more than 50 fucking years
And they aren't even doing the current snowy
2.0 tunnel boring, it's contracted out to dagos
which Turnbull was warned about by SMEC(Snowy Mountains Engineering >> Corporation)Turnbull didn't decide who got the contract
which have been found at the cost of tens ofNothing to do with who got the contract, everything
$billions to of been 100% correct and still rising.
to do with the geology that turned up
https://share.google/aimode/SewPrqtB9iMqlLaX8Those didn't predict a multi billion price increase
Snowy 2.0rCothe multi-billion-dollar pumped hydro expansion project
spearheaded by former Prime Minister Malcolm Turnbull
rCohave materialized as predicted by early independent engineering and
geological assessments.
Rigorous warnings regarding the immature design, severe subterraneanThe predicted cost escalation was nothing
fault zones, and highly optimistic pricing have proven precise,
resulting in monumental cost escalations.
even remotely like monumental, fuckwit
including specialized expertise in Tunnel Boring Machines (TBMs)You have never had a fucking clue https://www.abc.net.au/news/2026-10-31/snowy-scheme-has-place-in-world-of-batteries/107313340
| Sysop: | Amessyroom |
|---|---|
| Location: | Fayetteville, NC |
| Users: | 76 |
| Nodes: | 6 (0 / 6) |
| Uptime: | 61:00:09 |
| Calls: | 1,265 |
| Calls today: | 1 |
| Files: | 1,362 |
| D/L today: |
4 files (9,632K bytes) |
| Messages: | 286,219 |