• SNOWY 2 UPDATE blows out to $50bn

    From Petzl@petzlx@gmail.com to aus.politics on Thu Oct 22 18:40:16 2026
    From Newsgroup: aus.politics

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
    mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    October 22, 2026 - 3:11PMThe Australian Business Network2
    CommentsListen to this article5 minThe Snowy Hydro project is rapidly
    gaining the reputation as an expensive tunnel to nowhere.
    The documents sent to the federal government estimate that Malcolm
    TurnbullAs o$2bn Snowy 2. 0o will cost a massive $50bn, including
    the cost of transmission infrastructure.
    And it may go higher.
    Worse still, there is no certainty that the project will actually
    work.
    The massive blowout threatens the entire NSW renewable scheme,
    particularly as Queensland has disconnected and Victoria looks likely
    to follow, depending on the election result.
    The original 2017 estimate of then PM Turnbull looks like a back-of-the-envelope calculation for political purposes and does not
    appear to have included the essential cost of transmission.
    Later, when the project was designed, not enough notice was taken of
    the alerts in the early engineering studies, which warned of the
    geological hazards in drilling the required 17km tunnel. Then PM
    Malcolm Turnbull during a visit to Snowy Hydro in Cooma in August
    2017. Then PM Malcolm Turnbull during a visit to Snowy Hydro in
    Cooma in August 2017.
    Snowy 2.0 is a giant, pumped-hydro battery.
    It does not create power.
    The electricity will come from western NSW and similar remote areas.
    About 2000 towers u often 60m to 70m high or almost the height of the
    Sydney Harbour Bridge pylons u must be erected on AustraliaAs prime
    farming land to transmit power to and from the Snowy Mountains.
    Last February, in collaboration with Aidan Morrison of the Centre for Independent Studies, I warned that the project cost was exploding and
    could reach $40bn.
    At that stage, only about $8bn had been spent.
    But the costs kept rising and there is no guarantee that $50bn is the
    final figure.
    Snowy 2.0 is a classic example of how to not undertake a major
    Australian construction project.
    The Italy-based Webuild, which has close links to the CFMEU, won the
    tender (originally in a partnership, but the partners were not able to continue) using a low, fixed tender price.
    Once the project started, the costs quickly exploded above that
    tender, and Chris Bowen and his energy department, in conjunction with
    the government-owned developer Snowy Hydro, agreed to replace a
    fixed-price contract with a cost-plus contract.
    Any cost-plus contract with the CFMEU involved is a very dangerous
    agreement.
    After the cost-plus contract was signed, the costs continued to
    skyrocket. The first drilling was conducted from the top of the
    high country with a drill named Florence.
    But Florence was simply not suitable for the difficult terrain and had
    to be reconstructed.
    The new drill, Monica, which was brought in to tackle the difficult
    Long Plain Fault Zone.
    The new drill, Monica, which was brought in to tackle the difficult
    Long Plain Fault Zone.
    SafeWork NSW has brought criminal charges against Webuild over
    workplace safety issues during that early drilling.
    Webuild denies the charges, but undertaking one of AustraliaAs most
    complex projects under the cloud of criminal charges boosts costs. The centrepiece of the project is the 17km tunnel.
    The huge tunnel must pass through about 800m of some of the most
    difficult material in the world to drill u the so-called Long Plain
    Fault Zone. The Florence difficulties started even before it
    reached the Long Plain Fault Zone.
    It became clear that Florence simply would not have the ability to get
    through the fault zone.
    And so, a new drill called Monica was ordered to tackle the 800m fault
    zone from the bottom.
    This drill is clearly better designed for the task, but there is still
    no certainty that it will be able to get through the 800m and link
    with Florence.
    If Monica canAt get through the Long Plain Fault Zone, then the whole
    project will have to be abandoned.
    At the point of abandonment, whatever has been spent will be lost.
    Back in February, the official cost of the Snowy high country part of
    the project, including the tunnel, was officially estimated at $12bn u approaching three times the original fixed-price contract cost.
    With help, Morrison and I picked up that the $12bn was a fiction and
    that closer to $18bn was more realistic.
    But the escalations have kept coming and the best estimates are around
    $25bn.
    The now increased cost of the transmission towers (also to be oCFMEU
    managedo) approximately doubles the total cost to at least $50bn. Even
    if completed, with Snowy 2.0 the massive NSW renewables program will
    still require large amounts of gas-powered generation to maintain
    continuity of supply when power canAt be obtained from the wind and
    solar facilities.
    And because of the delays, coal generation will be required until the
    2040s.
    NSW is AustraliaAs largest commercial state, and the dramatic blowout
    of costs at Snowy 2.0 and the high cost and environmental problems
    that are emerging in the various renewable zones, plus the
    construction of thousands of transmission towers u often through prime
    farmland u will make NSW power among the most expensive in the nation. Renewables were sold to Australians as a cheap way of generating
    power, without emissions.
    But the Snowy 2.0 disaster now underlines to Australians that
    renewables can be cheap, but only if the right plans are put in place.
    The proposed plans are a cost disaster.
    The combination of Snowy 2.0 and the renewable zones was simply not
    the right way to harness renewables
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Thu Oct 22 19:33:23 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    Just another murdoch shit rag
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn
    Just another pathetic little murdoch journo's drug
    crazed drunken psychotic fantasys and lies https://grok.com/share/bGVnYWN5_46496b24-665a-46d8-8e33-44773b7defea
    and threatens NSWrCOs green mission Documents sent to CanberraWho gives a flying red fuck if it does ?
    now put Snowy 2.0rCOs combined cost at closer to $50bn,
    Just another pathetic little murdoch journo's drug
    crazed drunken psychotic fantasys and lies https://grok.com/share/bGVnYWN5_46496b24-665a-46d8-8e33-44773b7defea
    making it a classic example of how to not undertake a major project.We'll see...
    October 22, 2026 - 3:11PMThe Australian Business Network2
    CommentsListen to this article5 minThe Snowy Hydro project is rapidly
    gaining the reputation as an expensive tunnel to nowhere.
    Just because some fool claims something...
    The documents sent to the federal government estimate that Malcolm TurnbullrCOs rCL$2bn Snowy 2. 0rCY will cost a massive $50bn, including the cost of transmission infrastructure.
    Just because some fool claims something...
    And it may go higher.
    Just because some fool claims something...
    Worse still, there is no certainty that the project will actually
    work.
    Mindless bullshit
    The massive blowout threatens the entire NSW renewable scheme,
    Mindless bullshit
    particularly as Queensland has disconnected
    Bullshit it has
    and Victoria looks likely to follow, depending on the election result.
    Mindless bullshit
    The original 2017 estimate of then PM Turnbull looks like a back-of-the-envelope calculation for political purposes and does not
    appear to have included the essential cost of transmission.
    There is no cost of transmission involved
    Later, when the project was designed, not enough notice was taken of
    the alerts in the early engineering studies, which warned of the
    geological hazards in drilling the required 17km tunnel.
    Because nothing can be done about that, fuckwit
    Then PM Malcolm Turnbull during a visit to Snowy Hydro in
    Cooma in August 2017.
    Snowy 2.0 is a giant, pumped-hydro battery.
    It does not create power.
    No one ever said it does
    The electricity will come from western NSW and similar remote areas.
    Mindless pig ignorant bullshit
    About 2000 towers rCo often 60m to 70m high or almost the height of the Sydney Harbour Bridge pylons rCo must be erected on AustraliarCOs prime farming land to transmit power to and from the Snowy Mountains.
    Mindless pig ignorant bullshit
    And it doesn't stop any production of prime farming land
    Last February, in collaboration with Aidan Morrison of the Centre for Independent Studies, I warned that the project cost was exploding and
    could reach $40bn.
    And that was just more mindless pig ignorant shit from your stinking arse
    At that stage, only about $8bn had been spent.
    But the costs kept rising and there is no guarantee that $50bn is the
    final figure.
    There is no guarantee that your mindless pig ignorant shit doesn't stink> Snowy 2.0 is a classic example of how to not undertake a major
    Australian construction project.
    mindless pig ignorant shit
    The Italy-based Webuild, which has close links to the CFMEU, won the
    tender (originally in a partnership, but the partners were not able to> continue) using a low, fixed tender price.
    Once the project started, the costs quickly exploded above that
    tender, and Chris Bowen and his energy department, in conjunction with> the government-owned developer Snowy Hydro, agreed to replace a
    fixed-price contract with a cost-plus contract.
    Any cost-plus contract with the CFMEU involved is a very dangerous
    agreement.
    After the cost-plus contract was signed, the costs continued to
    skyrocket.
    You wouldn't know what a skyrcocket was even if it was fired up your arse
    The first drilling was conducted from the top of the
    high country with a drill named Florence.
    But Florence was simply not suitable for the difficult terrain and had> to be reconstructed.
    The new drill, Monica, which was brought in to tackle the difficult
    Long Plain Fault Zone.
    SafeWork NSW has brought criminal charges against Webuild over
    workplace safety issues during that early drilling.
    Webuild denies the charges, but undertaking one of AustraliarCOs most
    complex projects under the cloud of criminal charges boosts costs. The> centrepiece of the project is the 17km tunnel.
    The huge tunnel must pass through about 800m of some of the most
    difficult material in the world to drill rCo the so-called Long Plain
    Fault Zone. The Florence difficulties started even before it
    reached the Long Plain Fault Zone.
    It became clear that Florence simply would not have the ability to get> through the fault zone.
    And so, a new drill called Monica was ordered to tackle the 800m fault> zone from the bottom.
    This drill is clearly better designed for the task, but there is still> no certainty that it will be able to get through the 800m and link
    with Florence.
    If Monica canrCOt get through the Long Plain Fault Zone, then the whole project will have to be abandoned.
    mindless pig ignorant shit
    At the point of abandonment, whatever has been spent will be lost.
    Back in February, the official cost of the Snowy high country part of
    the project, including the tunnel, was officially estimated at $12bn rCo approaching three times the original fixed-price contract cost.
    With help, Morrison and I picked up that the $12bn was a fiction and
    that closer to $18bn was more realistic.
    And that is nothing even remotely like $50b
    But the escalations have kept coming and the best estimates are around> $25bn.
    And that is nothing even remotely like $50b
    The now increased cost of the transmission towers (also to be rCLCFMEU managedrCY)
    BULLSHIT
    approximately doubles the total cost to at least $50bn.
    BULLSHIT
    Even
    if completed, with Snowy 2.0 the massive NSW renewables program will
    still require large amounts of gas-powered generation to maintain
    continuity of supply when power canrCOt be obtained from the wind and
    solar facilities.
    BULLSHIT
    And because of the delays, coal generation will be required until the
    2040s.
    No problem with that
    NSW is AustraliarCOs largest commercial state, and the dramatic blowout
    of costs at Snowy 2.0 and the high cost and environmental problems
    that are emerging in the various renewable zones, plus the
    construction of thousands of transmission towers rCo often through prime farmland rCo will make NSW power among the most expensive in the nation.
    More mindless pig ignorant bullshit
    Renewables were sold to Australians as a cheap way of generating
    power, without emissions.
    But the Snowy 2.0 disaster now underlines to Australians that
    renewables can be cheap, but only if the right plans are put in place.> The proposed plans are a cost disaster.
    The combination of Snowy 2.0 and the renewable zones was simply not
    the right way to harness renewables
    There is no right way to do renewable
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From The Newsgroup Devil@Devil@Hell.biz to aus.politics on Thu Oct 22 23:10:33 2026
    From Newsgroup: aus.politics

    # /This is a reply to pre-filtered & auto edited post/
    # /All quoted inputs by kill-file residents have been expunged/


    theaustralian.com.au

    The typical Murdoch shit-stirrer propaganda fake and mis-info 'news'(?) outlet.
    Read it only if one is not afraid of permanent brain damage. In your
    case, Petz dear, it could obviously do no more harm! :-P


    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    YAWN!
    Snowy 2 is a mega project in an geologically extremely challenging environment. It is clear that the LNP dream up this scheme more like a
    magical solution to sustainable energy alternatives rather that
    something well thought out.
    A in case of most mega projects cost blow outs are to be expected
    specially when the construction runs over quite a number of years due to unanticipated technical difficulties.



    The Australian Business Network

    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    Sane and rational people immediately recognise why Murdoch's ghouls
    squad is so keen on rubbishing the project. Murdoch and his fossil fuels pushing billionaire mates don't want any alternative energy projects succeeding at all. It is as simple as that!

    NEXT!
    --
    |urd||g
    Your relentless newsgroup devil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Fri Oct 23 16:32:22 2026
    From Newsgroup: aus.politics

    On Thu, 22 Oct 2026 23:10:33 +0200, The Newsgroup Devil
    <Devil@Hell.biz> wrote:

    # /This is a reply to pre-filtered & auto edited post/
    # /All quoted inputs by kill-file residents have been expunged/


    theaustralian.com.au

    The typical Murdoch shit-stirrer propaganda fake and mis-info 'news'(?) >outlet.
    Read it only if one is not afraid of permanent brain damage. In your
    case, Petz dear, it could obviously do no more harm! :-P


    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
    mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    YAWN!
    Snowy 2 is a mega project in an geologically extremely challenging >environment. It is clear that the LNP dream up this scheme more like a >magical solution to sustainable energy alternatives rather that
    something well thought out.
    A in case of most mega projects cost blow outs are to be expected
    specially when the construction runs over quite a number of years due to >unanticipated technical difficulties.



    The Australian Business Network

    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    Sane and rational people immediately recognise why Murdoch's ghouls
    squad is so keen on rubbishing the project. Murdoch and his fossil fuels >pushing billionaire mates don't want any alternative energy projects >succeeding at all. It is as simple as that!

    NEXT!

    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.
    Now under Albanese Labor the project so far has cost $25 billion with
    tunneling not through the hardest geological part

    While initiated under the Turnbull Coalition government, the massive escalations and project resets have unfolded during the Albanese Labor government, with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefits.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Fri Oct 23 18:44:51 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote

    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.

    Now under Albanese Labor the project so far has cost $25 billion

    Nothing to do with the Albo govt, fuckwit

    with tunneling not through the hardest geological part

    More of your mindless bullshit

    While initiated under the Turnbull Coalition government, the massive escalations and project resets have unfolded during the Albanese Labor government,

    Nothing to do with the Albo govt, fuckwit

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Fri Oct 23 19:22:58 2026
    From Newsgroup: aus.politics

    On Fri, 23 Oct 2026 18:44:51 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will

    Major fail was from beginning
    https://share.google/aimode/Dp0w96SIBC3lJ5fsa
    Basic "Design Immaturity" at Sign-Off
    When the government and Snowy Hydro officially locked in the project,
    the engineering designs were completely incomplete.
    The federal Energy Minister explicitly confirmed that the A$25 billion
    blowout stems directly from "design immaturity" when the project was
    first greenlit.
    They signed contracts on a concept, not a finalized blueprint, which
    gave the construction consortium a blank check to bill taxpayers for
    every mistake.
    *********************
    The potentail
    Original Snowy Mountains Scheme: approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    A single modern large nuclear reactor is usually 1,000u1,600 MW.
    Examples: AP1000 (~1,100u1,200 MW), EPR (~1,600 MW), APR-1400 (~1,400
    MW).

    Many nuclear power stations have two or more reactors, so the whole
    site can easily be 2,000u3,000+ MW.

    Snowy 2.0As 2,200 MW (or the earlier design figure of 2,000 MW) is
    therefore roughly equivalent to:
    One-and-a-half to two large single reactors, or
    A medium-to-large multi-unit nuclear power station.
    So on pure nameplate generating capacity, yes u it is comparable to a substantial nuclear plant. Which will take 15 years to be buit and
    cost $60 Billion.
    --
    Petzl
    What happens when the insane are "voted" (preferences) to lead our
    Christian Commonwealth!

    "The definition of insanity is doing something over and over again
    and expecting a different result"
    Then stop voting Labor/"Greens"/Teals!
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 03:18:22 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will

    Major fail was from beginning

    Irrelevant to whether the completed pumped-hydro
    scheme will deliver long-term net benefit

    The potentail
    Original Snowy Mountains Scheme: approximately 4,100 MW of generating capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From The Newsgroup Devil@Devil@Hell.biz to aus.politics on Fri Oct 23 23:04:29 2026
    From Newsgroup: aus.politics

    # /This is a reply to pre-filtered & auto edited post/
    # /All quoted inputs by kill-file residents have been expunged/


    |urd||g
    Petz

    theaustralian.com.au

    The typical Murdoch shit-stirrer propaganda fake and mis-info 'news'(?)
    outlet.
    Read it only if one is not afraid of permanent brain damage. In your
    case, Petz dear, it could obviously do no more harm! :-P


    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    BTW, that $50B figure was pulled straight out of Murdoch's stinky arse!
    The real estimates are around half of that amount.

    YAWN!
    Snowy 2 is a mega project in an geologically extremely challenging
    environment. It is clear that the LNP dream up this scheme more like a
    magical solution to sustainable energy alternatives rather that
    something well thought out.
    A in case of most mega projects cost blow outs are to be expected
    specially when the construction runs over quite a number of years due to
    unanticipated technical difficulties.


    The Australian Business Network

    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    Sane and rational people immediately recognise why Murdoch's ghouls
    squad is so keen on rubbishing the project. Murdoch and his fossil fuels
    pushing billionaire mates don't want any alternative energy projects
    succeeding at all. It is as simple as that!

    NEXT!

    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.
    Now under Albanese Labor the project so far has cost $25 billion with tunneling not through the hardest geological part

    BULLSHIT!
    Stop sucking up all that anti-Labor rubbish rhetoric spread around by
    the Murdoch outlets, Petz dear!

    This project was and still is extremely challenging. It was certainly
    plagued by technical miscalculations and serious tunnelling equipment failures.

    /flush the remainder of that idiotic blame game crap/

    Yet another huge fail on your part. This is what happens when you post unfiltered Murdoch crap in utter desperation to find justification for
    blaming Labor for things not under their direct ability to
    control/modify. Every sane person by now clearly understand that Murdoch
    and Co are against any and all renewable energy generation projects as a principle. They are fully committed to the continuing use of fossil
    fuels until all such resources are exhausted and the environment/climate
    is absolutely wrecked.
    --
    |urd||g
    Your relentless newsgroup devil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 08:29:36 2026
    From Newsgroup: aus.politics

    On Fri, 23 Oct 2026 23:04:29 +0200, The Newsgroup Devil
    <Devil@Hell.biz> wrote:

    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.
    Now under Albanese Labor the project so far has cost $25 billion with
    tunneling not through the hardest geological part

    BULLSHIT!
    Stop sucking up all that anti-Labor rubbish rhetoric spread around by
    the Murdoch outlets, Petz dear!

    Turnbull was not Labor Party but in todays world he would be.
    You believe Alabanese Labor is Labour party?

    The original Labor movement was built by tradespeople, miners, railway
    workers, and factory handsupeople who knew what a hard day's physical
    work felt like..
    Today, that base has largely been replaced by a professional political
    class
    .1. The Death of the "Blue-Collar" Politician
    In the mid-to-late 20th century, a Labor MP was highly likely to have
    come straight from a shop floor or a trade..
    Today, a vast majority of Labor politicians in Australia follow a very specific, insular career path..
    The Pipeline:
    They go straight from university to working as a political staffer,
    then move into a role as a trade union official, and finally enter
    parliament..
    The Missing Link:
    They have never run a business, never had to worry about making
    commercial payroll, and have never worked a competitive job in the
    private sector
    .2. The Rise of the "Professional Class "When modern Labor parties do
    recruit from outside politics, they tend to pull from a very narrow
    pool of white-collar professionals, which explains observation about
    "failed lawyers".
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From The Newsgroup Devil@Devil@Hell.biz to aus.politics on Fri Oct 23 23:53:28 2026
    From Newsgroup: aus.politics

    # /This is a reply to pre-filtered & auto edited post/
    # /All quoted inputs by kill-file residents have been expunged/


    |urd||g
    Petz
    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.
    Now under Albanese Labor the project so far has cost $25 billion with
    tunneling not through the hardest geological part

    BULLSHIT!
    Stop sucking up all that anti-Labor rubbish rhetoric spread around by
    the Murdoch outlets, Petz dear!

    Turnbull was not Labor Party but in todays world he would be.

    Hmmm. Not quite, even if we acknowledge that the whole political
    spectrum with the exception of the far-left has a nasty right shift.

    Turnbull was and apparently still is a *small 'l'* liberal with
    neo-liberal economic views. I suppose Labor has moved a little bit
    closer to his position on the political right.

    In the mean time the LNP has been utterly hijacked by incompetent
    hard-right extremists. One can justifiably conclude that they have
    become One Notion light!

    You believe Alabanese Labor is Labour party?

    I don't play the politics of "belief", quite unlike the way you do, Petz
    dear!
    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it
    still stands for the interest of the wage slave class, but just barely!

    /snip copy and paste/
    --
    |urd||g
    Your relentless newsgroup devil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Peter Jason@pj@jostle.com to aus.politics on Sat Oct 24 08:54:56 2026
    From Newsgroup: aus.politics

    On Thu, 22 Oct 2026 18:40:16 +1100, Petzl <petzlx@gmail.com> wrote:

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.



    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.



    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$


    Fugg; old people are lucky; they're gonna die soon.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 09:17:27 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote

    Turnbull was not Labor Party but in todays world he would be.

    Bullshif

    You believe Alabanese Labor is Labour party?

    Corse he is, the Libs have never had any leftys like him

    <reams of mindless repeated shit flushed where it belongs>
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 09:23:45 2026
    From Newsgroup: aus.politics

    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    From Chatbot....
    **Hello, what is the purpose of "Snowy-2" project in NSW?**
    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.
    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a> complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.
    For example:
    Stage
    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)
    The losses occur because of inefficiencies in the pumps, turbines and generators, as well as friction as water flows through the tunnels.
    An important distinction: the 25% is the loss within the storage cycle> itself. Additional electricity is lost when transmitting power through> the grid, so the total loss from the original power source to the
    final consumer can be higher.
    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.
    "...still be useful??" For 50billion$
    That $50b is straight from that fool's arse
    Fugg; old people are lucky; they're gonna die soon.
    But will be paying for Snowy 2.0 right now
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Peter Jason@pj@jostle.com to aus.politics on Sat Oct 24 10:40:45 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 09:23:45 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
    mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.

    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.

    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    That $50b is straight from that fool's arse

    Fugg; old people are lucky; they're gonna die soon.

    But will be paying for Snowy 2.0 right now

    For all that money we might invest in a nuclear option.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 10:50:38 2026
    From Newsgroup: aus.politics

    Peter Jason <pj@jostle.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>> at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    From Chatbot....
    **Hello, what is the purpose of "Snowy-2" project in NSW?**
    The Snowy 2.0 project is a major Australian renewable energy project>>> designed to store electricity and supply power when people and
    businesses need it most.
    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.>>> For example:
    Stage
    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)
    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.
    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.
    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.
    "...still be useful??" For 50billion$
    That $50b is straight from that fool's arse
    Fugg; old people are lucky; they're gonna die soon.
    But will be paying for Snowy 2.0 right now
    For all that money we might invest in a nuclear option.
    Its nothing even remotely like that money
    and the one the poms are currently building
    is costing much more than $50b and jusf one
    of those isn'f going go work here because
    everyone who has nuke power generation
    has more than just one of them
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From pursent100@pursent100@gmail.com to aus.politics on Fri Oct 23 17:41:49 2026
    From Newsgroup: aus.politics

    Rod Speed wrote:
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will

    Major fail was from beginning

    Irrelevant to whether the completed pumped-hydro
    scheme will deliver long-term net benefit

    The potentail
    Original Snowy Mountains Scheme: approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.

    well ham bam grand slam california jam
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 11:55:53 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 03:18:22 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will

    Major fail was from beginning

    Irrelevant to whether the completed pumped-hydro
    scheme will deliver long-term net benefit

    In denial again the 2017 deal $2 billion was born to fail, looked like
    a scam then.

    Snowy 2.0 was not simply unlucky. The engineering warnings were there
    early.
    SMEC engineers wanted more geotechnical drilling because they were
    concerned about the tunnel route and warned a boring machine could
    become stuck.

    Snowy rejected that advice, then announced the project at about $2
    billion in 2017.

    That is not a scam in the criminal sense, but it is a failure of due
    diligence, honest costing and project governance. Governments should
    not announce multibillion-dollar projects on optimistic headline
    figures when their own engineers are asking for more investigation.

    The potentail
    Original Snowy Mountains Scheme: approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 12:13:55 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 08:54:56 +1100, Peter Jason <pj@jostle.com> wrote:

    On Thu, 22 Oct 2026 18:40:16 +1100, Petzl <petzlx@gmail.com> wrote:

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.



    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and >generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle >itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.



    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    Fugg; old people are lucky; they're gonna die soon.

    Reality
    The potentail after it's own energy requirements
    Original Snowy Mountains Scheme:
    approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.

    Based on current energy economic modeling and recent international
    benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.

    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
    premium, which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.

    Time from start to finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 12:31:01 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 09:23:45 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green
    mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.

    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.

    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    That $50b is straight from that fool's arse

    Fugg; old people are lucky; they're gonna die soon.

    But will be paying for Snowy 2.0 right now

    Total completion cost now is believed to be $50 Billion
    The $20 odd billion will be for just the tunneling,
    No reliable time frame given when completion will be?
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 12:33:38 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    with Energy Minister Chris Bowen describing the blowouts
    as "very disappointing" while maintaining that the completed
    pumped-hydro scheme will deliver long-term net benefit

    Corse it will

    Major fail was from beginning

    Irrelevant to whether the completed pumped-hydro
    scheme will deliver long-term net benefit

    In denial again the 2017 deal $2 billion was born to fail,

    There was no deal and it hasn't failled

    looked like a scam then.

    Just another of your silly little pig ignorant fantasys

    Snowy 2.0 was not simply unlucky.

    No one said anything about unlucky

    The engineering warnings were there early.

    It was always possible that the geology could surprise

    SMEC engineers wanted more geotechnical drilling

    And it is far from clear that that would have ensured no problem

    because they were concerned about the tunnel routeand warned a boring machine could become stuck.

    That's always a possibility with any tunnel boring and its
    always possible to use a different machine if that happens

    Snowy rejected that advice, then announced the project at about $2
    billion in 2017.

    That is not a scam in the criminal sense,

    Its not a scam in any sense, just a matter that no tunnel
    boring is ever a cast iron certainly price wise

    but it is a failure of due diligence,

    Nothing to do with due diligence given
    that the geology is always an unknown
    until the tunnel borer gets there

    honest costing

    Nothing to do with honesty

    and project governance.

    or governance

    Governments should
    not announce multibillion-dollar projects on optimistic headline
    figures when their own engineers are asking for more investigation.

    Any project is a balance between investigation and what makes sense

    The potentail
    Original Snowy Mountains Scheme: approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 12:37:18 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 10:40:45 +1100, Peter Jason <pj@jostle.com> wrote:

    On Sat, 24 Oct 2026 09:23:45 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>>> mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.

    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.

    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    That $50b is straight from that fool's arse

    Fugg; old people are lucky; they're gonna die soon.

    But will be paying for Snowy 2.0 right now

    For all that money we might invest in a nuclear option.

    That's the question what will it cost to complete Snowy 2
    Supposedly another $30 billion.

    A Nuclear power alternative will cost A$60.5 billion and take at least
    from start 15 years to complete

    Based on current energy economic modeling and recent international
    benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.

    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
    premium, which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.

    Time from start to Finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 12:43:41 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green >>> mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    From Chatbot....
    **Hello, what is the purpose of "Snowy-2" project in NSW?**
    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.
    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.
    For example:
    Stage
    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)
    The losses occur because of inefficiencies in the pumps, turbines and>> generators, as well as friction as water flows through the tunnels.
    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.
    The project can still be useful because it stores surplus electricity>> when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.
    "...still be useful??" For 50billion$
    Fugg; old people are lucky; they're gonna die soon.
    Reality
    The potentail after it's own energy requirements
    Original Snowy Mountains Scheme:
    approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    Based on current energy economic modeling and recent international benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.
    That is nothing like the currently being built by the poms cost
    And it makes no sense to build a nuke of the same capacity
    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise
    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK) premium,
    Not when you just copy the design of what is clearly
    working fine in one of the foreign nukes
    In spades when you get those to built it to make one for us
    which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.
    Time from start to finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.
    That's bullshit too given we wouldn't have
    to do the stupid stuff that the EU mandates
    It didnt take France of the poms or the yanks
    anything even remotely like that long to build
    the first of theirs of that generating capacity
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 12:44:13 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 10:50:38 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    For all that money we might invest in a nuclear option.

    Its nothing even remotely like that money
    and the one the poms are currently building
    is costing much more than $50b and jusf one
    of those isn'f going go work here because
    everyone who has nuke power generation
    has more than just one of them

    And it's not the first the UK have built, so cheaper and quicker than
    a first of it's kind (FOIK) which is what Australia's would as
    everything needed included overseas teams needed to build and run it
    would be imported
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 12:59:36 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 12:43:41 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Petzl <petzlx@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullAs $2bn Snowy 2.0 blows out to $50bn and threatens NSWAs green >>>> mission Documents sent to Canberra now put Snowy 2.0As combined cost
    at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23u25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75u77% round-trip efficiency in published project modelling.

    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through
    the grid, so the total loss from the original power source to the
    final consumer can be higher.

    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    Fugg; old people are lucky; they're gonna die soon.

    Reality
    The potentail after it's own energy requirements
    Original Snowy Mountains Scheme:
    approximately 4,100 MW of generating
    capacity.

    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.

    Based on current energy economic modeling and recent international
    benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.

    That is nothing like the currently being built by the poms cost

    Not a "First-of-a-Kind" (FOAK) there, will be here

    And it makes no sense to build a nuke of the same capacity
    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise

    Sort of agree Snowy 2 failure has been because of
    "dumb as a door knob types" overriding experts like those already
    working for the Snowy mountains scheme.
    They pointed this out in 2017.

    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
    premium,

    Not when you just copy the design of what is clearly
    working fine in one of the foreign nukes

    "First-of-a-Kind" (FOAK) even teams to build and run it will have to
    be imported, then there is "miles" of government legislation that has
    to be implemented.

    In spades when you get those to built it to make one for us

    which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.

    Time from start to finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.

    That's bullshit too given we wouldn't have
    to do the stupid stuff that the EU mandates

    It didnt take France of the poms or the yanks
    anything even remotely like that long to build
    the first of theirs of that generating capacity

    Again "First-of-a-Kind" (FOAK) scenario.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 13:04:47 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 12:33:38 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    SMEC engineers wanted more geotechnical drilling

    And it is far from clear that that would have ensured no problem

    Their expertise was tunnels and geology of the Snowy scheme as well as
    tunnel boring machines
    Sydney is full of tunnel boring machines with zero mistakes over a
    hundred miles of bored tunnels in Australia.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 13:10:42 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs >>>>> green
    mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    From Chatbot....
    **Hello, what is the purpose of "Snowy-2" project in NSW?**
    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.
    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.
    For example:
    Stage
    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)
    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.>>>> An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
    final consumer can be higher.
    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the>>>> facility.
    "...still be useful??" For 50billion$
    That $50b is straight from that fool's arse
    Fugg; old people are lucky; they're gonna die soon.
    But will be paying for Snowy 2.0 right now
    For all that money we might invest in a nuclear option.
    That's the question what will it cost to complete Snowy 2
    Supposedly another $30 billion.
    That stupid number is straight from the arse
    of that unamed fool you previously quoted
    A Nuclear power alternative will cost A$60.5 billion
    That number is straight from your arse
    What the poms are building is costing MUCH more
    than that and that wouldnt be enough for us because
    that is just the one nuke and that isnt what we need
    and take at least from start 15 years to complete
    More mindless bullshit from you
    Based on current energy economic modeling and recent international benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.
    Nothing even remotely like the cost of what the poms are building
    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK) premium, which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.
    Like I said, the obvious approach would be to get
    those that are building what the poms are building
    to build two for us too which fixes that problem
    Time from start to Finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.
    Because of the stupid detail the EU fuckwits have imposed on them
    It didnt take anything like that long to
    build the first fleet France or the poms
    or the yanks or Canadians built
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 13:16:56 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    For all that money we might invest in a nuclear option.

    Its nothing even remotely like that money
    and the one the poms are currently building
    is costing much more than $50b and jusf one
    of those isn'f going go work here because
    everyone who has nuke power generation
    has more than just one of them

    And it's not the first the UK have built, so cheaper and quicker than
    a first of it's kind (FOIK) which is what Australia's would as
    everything needed included overseas teams needed to build and run it
    would be imported

    Like I said, the obvious approach is to get them two more
    like that for us and that would cost MUCH more than that
    stupid $50b lie

    And yes, it would make sense to pull the plug on the
    stupid AUKUS subs and spend much less than the
    cost of that on 2 of the pom nukes and complete
    Snowy 2.0 as well because it makes no sense
    whateever to pull the plug on Snowy 2.0 now
    after so much has been spent on it already
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 13:23:53 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff
    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs >>>>> green
    mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
    undertake a major project.
    From Chatbot....
    **Hello, what is the purpose of "Snowy-2" project in NSW?**
    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.
    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.
    For example:
    Stage
    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)
    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.>>>> An important distinction: the 25% is the loss within the storage cycle
    itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
    final consumer can be higher.
    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the>>>> facility.
    "...still be useful??" For 50billion$
    Fugg; old people are lucky; they're gonna die soon.
    Reality
    The potentail after it's own energy requirements
    Original Snowy Mountains Scheme:
    approximately 4,100 MW of generating
    capacity.
    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.
    Based on current energy economic modeling and recent international
    benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and>>> A$60.5 billion.
    That is nothing like the one currently being built by the poms cost
    Not a "First-of-a-Kind" (FOAK) there, will be here
    Doesn't have to be that here
    And it makes no sense to build a nuke of the same capacity
    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise
    Sort of agree Snowy 2 failure
    There is no failure, just a cost increase
    has been because of
    "dumb as a door knob types" overriding experts
    That didn't happen either
    like those already
    working for the Snowy mountains scheme.
    Who were never involved in any tunnel boring
    They pointed this out in 2017.
    They actually CLAIMED that, a different matter entirely
    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
    premium,
    Not when you just copy the design of what is clearly
    working fine in one of the foreign nukes
    "First-of-a-Kind" (FOAK) even teams to build and run it will have to
    be imported,
    Wrong with running it, ours can train on the pom
    one which will be running before ours would be
    then there is "miles" of governmentlegislation that has to be > implemented.
    Which costs peanuts
    In spades when you get those to built it to make one for us
    which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.
    Time from start to finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.
    That's bullshit too given we wouldn't have
    to do the stupid stuff that the EU mandates
    It didnt take France of the poms or the yanks
    anything even remotely like that long to build
    the first of theirs of that generating capacity
    Again "First-of-a-Kind" (FOAK) scenario.
    Again, we don't have to do it like that
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From pursent100@pursent100@gmail.com to aus.politics on Fri Oct 23 19:45:29 2026
    From Newsgroup: aus.politics

    Petzl wrote:
    On Sat, 24 Oct 2026 12:43:41 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Petzl <petzlx@gmail.com> wrote
    Peter Jason <pj@jostle.com> wrote
    Petzl <petzlx@gmail.com> wrote

    <https://www.theaustralian.com.au/subscribe/news/1/?sourceCode=TAWEB_WRE170_a_GGL&dest=https%3A%2F%2Fwww.theaustralian.com.au%2Fcommentary%2Fmalcolm-turnbulls-2bn-snowy-20-blows-out-to-50bn-and-threatens-nsws-green-mission%2Fnews-story%2F14c0279c861dc42a51fbc55e3b0dc0fd&memtype=anonymous&mode=premium&v21=GROUPA-Segment-2-NOSCORE>
    https://tinyurl.com/bdcpuaff

    TurnbullrCOs $2bn Snowy 2.0 blows out to $50bn and threatens NSWrCOs green
    mission Documents sent to Canberra now put Snowy 2.0rCOs combined cost >>>>> at closer to $50bn, making it a classic example of how to not
    undertake a major project.

    From Chatbot....

    **Hello, what is the purpose of "Snowy-2" project in NSW?**

    The Snowy 2.0 project is a major Australian renewable energy project
    designed to store electricity and supply power when people and
    businesses need it most.

    **Thanks, what is the % energy loss in pumping water uphill?**
    ChatGPT said:
    For Snowy 2.0, the estimated energy loss is about 23rCo25% for a
    complete pumping-and-generation cycle. That corresponds to roughly
    75rCo77% round-trip efficiency in published project modelling.

    For example:

    Stage

    Electricity
    Electricity used to pump water uphill
    100 kWh
    Electricity recovered when water flows downhill
    75 kWh
    Energy lost
    25 kWh (25%)

    The losses occur because of inefficiencies in the pumps, turbines and
    generators, as well as friction as water flows through the tunnels.

    An important distinction: the 25% is the loss within the storage cycle >>>> itself. Additional electricity is lost when transmitting power through >>>> the grid, so the total loss from the original power source to the
    final consumer can be higher.

    The project can still be useful because it stores surplus electricity
    when demand is low and releases it when demand is high. The key
    question is whether the value of that electricity at peak times
    outweighs the cost of the energy lost and the cost of operating the
    facility.

    "...still be useful??" For 50billion$

    Fugg; old people are lucky; they're gonna die soon.

    Reality
    The potentail after it's own energy requirements
    Original Snowy Mountains Scheme:
    approximately 4,100 MW of generating
    capacity.

    Snowy 2.0 adds 2,200 MW.
    Combined total: about 6,300 MW.
    2,000 MW is in the same ballpark as a large nuclear power plant.

    Based on current energy economic modeling and recent international
    benchmarks, building a 2,200 MW (2.2 GW) multi-unit nuclear power
    station in Australia is estimated to cost between A$39.6 billion and
    A$60.5 billion.

    That is nothing like the currently being built by the poms cost

    Not a "First-of-a-Kind" (FOAK) there, will be here

    And it makes no sense to build a nuke of the same capacity
    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise

    Sort of agree Snowy 2 failure has been because of
    "dumb as a door knob types" overriding experts like those already
    working for the Snowy mountains scheme.
    They pointed this out in 2017.

    Because Australia lacks an established domestic nuclear industry,
    aligns perfectly with what economists call a "First-of-a-Kind" (FOAK)
    premium,

    Not when you just copy the design of what is clearly
    working fine in one of the foreign nukes

    "First-of-a-Kind" (FOAK) even teams to build and run it will have to
    be imported, then there is "miles" of government legislation that has
    to be implemented.

    In spades when you get those to built it to make one for us

    which factors in the extreme expense of importing foreign
    expertise, engineering crews, and specialized supply chains from
    countries like the US or the UK.

    Time from start to finnish/operating a Large (2.3GW) Nuclear power
    station exceeds 15 years.

    That's bullshit too given we wouldn't have
    to do the stupid stuff that the EU mandates

    It didnt take France of the poms or the yanks
    anything even remotely like that long to build
    the first of theirs of that generating capacity

    Again "First-of-a-Kind" (FOAK) scenario.

    rod speed's an old liar
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Newsgroup Evil@Evil@Hell.biz to aus.politics,uk.legal on Sat Oct 24 14:06:27 2026
    From Newsgroup: aus.politics

    It's not as though a disposition as predilection for child pornography
    is suddenly acquired -- perhaps life circumstances changed which granted accessibility and permissibility.

    But the question I have relates to behavioural compensation for the conjectural scenario: "LITTLE MISS MARKLE RAISED TO BE DADDY'S LITTLE PRINCESS" and whether the adverse conduct directed towards the BRITISH
    ROYALTY is then a consequence --

    1) an initial positive, ethical choice: marry a real life titled prince
    2) grants a kind of 'moral permission' or 'self-licensing' to
    subsequently indulge in a less sustainable behavior: slander of the
    ROYAL HOUSEHOLD

    Behavioral Compensation is a psychological mechanism that occurs when an individual makes an initial positive, ethical choice. It is the internal mechanism that grants a kind of 'moral permission' or 'self-licensing'
    to subsequently indulge in a less sustainable behavior. This process
    operates beneath the surface of conscious thought, often nullifying the environmental benefits of the first action. The true impact of our
    efforts toward a better life and planet often gets eroded by this very
    human tendency to balance the scales of our personal goodness.
    Understanding this concept is essential for anyone starting their path
    in sustainable living, as it shifts the focus from simple good deeds to
    the systemic consistency of daily life.



    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    --
    |ard||g
    Your relentless newsgroup evil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From pursent100@pursent100@gmail.com to aus.politics,uk.legal,alt.tits on Fri Oct 23 20:12:56 2026
    From Newsgroup: aus.politics

    Newsgroup Evil wrote:
    It's not as though a disposition as predilection for child pornography
    is suddenly acquired -- perhaps life circumstances changed which granted accessibility and permissibility.

    But the question I have relates to behavioural compensation for the conjectural scenario: "LITTLE MISS MARKLE RAISED TO BE DADDY'S LITTLE PRINCESS" and whether the adverse conduct directed towards the BRITISH ROYALTY is then a consequence --

    1) an initial positive, ethical choice: marry a real life titled prince
    2) grants a kind of 'moral permission' or 'self-licensing' to
    subsequently indulge in a less sustainable behavior: slander of the
    ROYAL HOUSEHOLD

    Behavioral Compensation is a psychological mechanism that occurs when an individual makes an initial positive, ethical choice. It is the internal mechanism that grants a kind of 'moral permission' or 'self-licensing'
    to subsequently indulge in a less sustainable behavior. This process operates beneath the surface of conscious thought, often nullifying the environmental benefits of the first action. The true impact of our
    efforts toward a better life and planet often gets eroded by this very
    human tendency to balance the scales of our personal goodness.
    Understanding this concept is essential for anyone starting their path
    in sustainable living, as it shifts the focus from simple good deeds to
    the systemic consistency of daily life.



    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    what
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 14:35:39 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    SMEC engineers wanted more geotechnical drilling

    And it is far from clear that that would have ensured no problem

    Their expertise was tunnels and geology of the Snowy scheme

    That's bullshit given that all of that was done
    LONG before they were ever employed by the
    SMEC and the original Snowy scheme never
    ever used ANY tunnel boring machines so
    there was no expertise with those at all

    as well as tunnel boring machines

    The original Snowy scheme never ever
    used ANY tunnel boring machines so
    there was no expertise with those at all

    Sydney is full of tunnel boring machines

    The geology of Sydney is completely different to the snowy

    with zero mistakes over a hundredmiles of bored tunnels in Australia.

    None of which happened in the snowy
    and you are just plain wrong about
    zero surprises with tunnel boring,
    most obviously with one under sydney
    harbour which came close to imploding

    https://grok.com/share/bGVnYWN5_6eb2610b-99c8-43ca-9674-60ed7e27a8a2
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From dolf@dolfboek@hotmail.com to aus.politics,uk.legal on Sat Oct 24 03:38:56 2026
    From Newsgroup: aus.politics

    psychological mechanism?

    Quite rightly so -- when does miss markle cease being the actress ...

    It's only a hypothetical question since she might have lived with her
    father after 9yo ...

    What is the psychological mechanism of a perceived internal state which controls outward action and statements--is it natural or a coerced
    disposition?



    Newsgroup Evil <Evil@Hell.biz> wrote:
    It's not as though a disposition as predilection for child pornography
    is suddenly acquired -- perhaps life circumstances changed which granted accessibility and permissibility.

    But the question I have relates to behavioural compensation for the conjectural scenario: "LITTLE MISS MARKLE WAS RAISED TO BE DADDY'S LITTLE PRINCESS" and whether the adverse conduct directed towards the BRITISH ROYALTY is then a consequence --

    1) an initial positive, ethical choice: marry a real life titled prince
    2) grants a kind of 'moral permission' or 'self-licensing' to
    subsequently indulge in a less sustainable behavior: slander of the
    ROYAL HOUSEHOLD

    Behavioral Compensation is a psychological mechanism that occurs when an individual makes an initial positive, ethical choice. It is the internal mechanism that grants a kind of 'moral permission' or 'self-licensing'
    to subsequently indulge in a less sustainable behavior. This process operates beneath the surface of conscious thought, often nullifying the environmental benefits of the first action. The true impact of our
    efforts toward a better life and planet often gets eroded by this very
    human tendency to balance the scales of our personal goodness.
    Understanding this concept is essential for anyone starting their path
    in sustainable living, as it shifts the focus from simple good deeds to
    the systemic consistency of daily life.



    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    --

    Check out our SAVVY module prototype that facilitates a movable / resizable DIALOG and complex dropdown MENU interface deploying the third party d3 library.

    <http://www.grapple369.com/>
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 16:07:36 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 13:23:53 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise

    Sort of agree Snowy 2 failure

    There is no failure, just a cost increase

    has been because of
    "dumb as a door knob types" overriding experts

    That didn't happen either

    read it <https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf>
    Yes, the primary documents containing these initial expert warnings
    are available to the public.
    When Malcolm Turnbull anouced it



    (https://www.google.com/search?kgmid=%2Fm%2F01tpld&q=Malcolm+Turnbull) announced the $2 billion preliminary estimate in March 2017, Snowy
    Hydro commissioned the Snowy Mountains Engineering Corporation
    (SMEC)uthe original engineering firm behind the historical Snowy
    Mountains Schemeuto conduct the official project analysis. [1] (https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf),
    [2] (https://www.afr.com/companies/energy/announcement-fever-blamed-for-snowy-2-0-cost-debacle-20261023-p6180p),
    [3] (https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),
    [4] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)
    The original warnings and data can be tracked down through these
    specific avenues:

    1. The SMEC Snowy 2.0 Feasibility Study (December 2017)

    The core engineering warnings originated here. The study explicitly
    stated that the $2 billion figure was highly unrealistic,
    recalculating the baseline cost immediately to between $3.8 billion
    and $4.5 billion. Crucially, SMEC engineers explicitly warned about:
    [1] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [2] (https://www.linkedin.com/posts/chiefindustryoptimist_how-malcolm-turnbull-thought-snowy-20-could-activity-7519200702041112576-VGLO)
    o Extreme Geological Volatility: Tunnelling through 30 different types
    of rock and three major active fault lines (including the high-risk
    Long Plain Fault Zone). [1] (https://www.facebook.com/EngineersAustralia/videos/hydro-heaven/28660325236984873/)
    o Lack of Data: A stark warning that there was "insufficient
    geotechnical drilling" conducted prior to contract finalization. They
    noted that without deeper drilling, tunnel boring machines (TBMs)
    risked getting stuck in unmapped soft ground and fissures. [1] (https://www.news24.com.au/business/energy/snowy-hydro-20-likely-less-than-halfway-complete-expert-warns-after-damning-report-reveals-drastic-shortcomings/news-story/cc9484d67196bff5bfb63a7a7bdee147),
    [2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)
    o Where to access it: The full, multi-volume Snowy 2.0 Feasibility
    Study and Business Cases are hosted publicly on the official Snowy
    Hydro Documents Portal. [1]
    (https://www.snowyhydro.com.au/snowy-20/documents/)

    2. The Geotechnical and Environmental Impact Statements (EIS)

    As the engineers predicted, the lack of initial site proofing led to
    severe contract failures, including the Tunnel Boring Machine Florence
    famously getting trapped in soft mud and causing a massive 9-metre
    deep environmental sinkhole. [1] (https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/),
    [2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [3] (https://www.abc.net.au/news/2023-10-23/snowy-hydro-sinkhole-toxic-gas-tunnelling-four-corners/102995568)
    o Where to access it: The extensive engineering and 383-page
    Geotechnical Remediation Reports detailing these exact contract and
    drilling failures are available publicly via the NSW Major Projects
    Planning Portal, filed under the Snowy 2.0 Main Works modifications.
    [1] (https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/)

    3. The Australian National Audit Office (ANAO) Reports

    For a high-level critique of how Snowy Hydro executives managed the
    engineering contracts and why they ignored early warning signs, the
    federal auditor has published independent reports. [1] (https://www.abc.net.au/news/2026-06-18/auditors-say-snowy-2-0-not-holding-contractors-accountable/106700336),
    [2] (https://www.hancockenergy.com.au/snowy-hydro-blame-game-erupts-amid-cost-blowout-tensions/)
    o Where to access it: You can read the independent breakdown of the
    project's flawed delivery model directly on the ANAO Report No. 33 of
    2021u22 page. [1] (https://www.anao.gov.au/work/performance-audit/snowy-20-governance-early-implementation)
    Note: Following the exact risks the SMEC engineers warned about, the
    contract had to be completely re-negotiated from a performance-based
    contract to a "cost-plus" model, and the total projected cost has
    ballooned from the initial $2 billion to an estimated $22 billionu$25
    billion. [1] (https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),
    [2] (https://www.facebook.com/theaustralian/posts/snowy-hydros-board-investigated-sacking-the-lead-contractor-building-australias-/1552765453554982/),
    [3] (https://au.news.yahoo.com/snowy-2-0-could-cost-212957212.html)
    --
    Petzl
    It's hard to win an argument with a smart person but it's damn near impossible to win
    an argument with a stupid person

    When you're dead, you don't know you're dead.
    The pain is felt by others.

    The same thing happens when you're stupid
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 16:12:10 2026
    From Newsgroup: aus.politics

    On Fri, 23 Oct 2026 19:45:29 -0700, % <pursent100@gmail.com> wrote:

    It didnt take France of the poms or the yanks
    anything even remotely like that long to build
    the first of theirs of that generating capacity

    Again "First-of-a-Kind" (FOAK) scenario.

    rod speed's an old liar

    He is avoiding that a Nuclear Power pant is just part of a complex
    proccess.
    before it starts Government will need legislation authorising it and
    dispoale, stock piles roads emergency and it goes on.
    They do not just come in a Weetbix box.
    --
    Petzl
    An evil enemy will from within,
    will burn his own nation to then rule over the ashes.
    Chinese military strategist Sun Tzu
    (author of The Art of War), 5th century BC.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sat Oct 24 16:15:55 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 14:35:39 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    as well as tunnel boring machines

    The original Snowy scheme never ever
    used ANY tunnel boring machines so
    there was no expertise with those at all

    Sydney is full of tunnel boring machines

    The geology of Sydney is completely different to the snowy

    Doubt if any of the Snowy engineers are still alive.
    These engineers would be today's and familiar with Tunnel Boring
    Machines
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 16:45:30 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    as Snowy 2.0. what should be built is the capacity that makes
    sense for us nuke wise
    Sort of agree Snowy 2 failure
    There is no failure, just a cost increase
    has been because of
    "dumb as a door knob types" overriding experts
    That didn't happen either
    read it
    Get fucked
    <https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf> Yes, the primary documents containing these initial expert warnings
    are available to the public.
    They were nothing even remotely like experts
    at tunnel boring given that NONE of them had
    ever done any tunnel boring what so ever,
    let alone being expert at tunnel boring
    When Malcolm Turnbull anouced it (https://www.google.com/search?kgmid=%2Fm%2F01tpld&q=Malcolm+Turnbull) announced the $2 billion preliminary estimate in March 2017, Snowy
    Hydro commissioned the Snowy Mountains Engineering Corporation
    (SMEC)rCothe original engineering firm behind the historical Snowy
    Mountains SchemerCoto conduct the official project analysis. [1]Wota fucking surprise
    (https://www.snowyhydro.com.au/wp-content/uploads/2026/09/Procurement.pdf), [2]
    Which says nothing even remotely like the shit and lies you spew
    (https://www.afr.com/companies/energy/announcement-fever-blamed-for-snowy-2-0-cost-debacle-20261023-p6180p),
    [3]
    Just another murdoch shit rag that never has a fucking clue
    (https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),
    Just another rabid lefty shit rag that hates the libs
    [4] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)
    Just some grandstanding irrelevant clown
    The original warnings and data can be tracked down through these
    specific avenues:
    1. The SMEC Snowy 2.0 Feasibility Study (December 2017)
    The core engineering warnings originated here.
    From those who were never anything even remotely
    like tunnel boring experts because they had never
    ever been involved in any tunnel boring
    The study explicitly stated that the $2 billion figure was highly > unrealistic,
    Irrelevant to your stupid ignorant claim about failure
    recalculating the baseline cost immediately to between $3.8 billion
    and $4.5 billion.
    So they completely fucked that up too
    Crucially, SMEC engineers explicitly warned about:
    [1] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [2] (https://www.linkedin.com/posts/chiefindustryoptimist_how-malcolm-turnbull-thought-snowy-20-could-activity-7519200702041112576-VGLO)
    rCo Extreme Geological Volatility: Tunnelling through 30 different types
    of rock and three major active fault lines (including the high-risk
    Long Plain Fault Zone). [1]
    No news and they completely fucked up their calculation too
    (https://www.facebook.com/EngineersAustralia/videos/hydro-heaven/28660325236984873/)
    rCo Lack of Data: A stark warning that there was "insufficient
    geotechnical drilling" conducted prior to contract finalization. They
    noted that without deeper drilling, tunnel boring machines (TBMs)
    risked getting stuck in unmapped soft ground and fissures. [1]
    Wota surprise and they completely fucked up their calculation too
    (https://www.news24.com.au/business/energy/snowy-hydro-20-likely-less-than-halfway-complete-expert-warns-after-damning-report-
    It was in fact nothing even remotely like that and
    they completely fucked up their calculation too reveals-drastic-shortcomings/news-story/cc9484d67196bff5bfb63a7a7bdee147),
    [2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5)
    rCo Where to access it: The full, multi-volume Snowy 2.0 Feasibility
    Study and Business Cases are hosted publicly on the official Snowy
    Hydro Documents Portal. [1] (https://www.snowyhydro.com.au/snowy-20/documents/)
    Which says nothing like you stupidly claim
    2. The Geotechnical and Environmental Impact Statements (EIS)
    As the engineers predicted, the lack of initial site proofing led to
    severe contract failures, including the Tunnel Boring Machine Florence> famously getting trapped in soft mud and causing a massive 9-metre
    deep environmental sinkhole. [1]
    And they completely fucked up their calculation too
    (https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/),
    Wota surprise because the tunnelling machine had not be replaced yet
    [2] (https://www.youtube.com/watch?v=GJhxRknHCvU&t=5), [3] (https://www.abc.net.au/news/2023-10-23/snowy-hydro-sinkhole-toxic-gas-tunnelling-four-corners/102995568)
    rCo Where to access it: The extensive engineering and 383-page
    Geotechnical Remediation Reports detailing these exact contract and
    drilling failures are available publicly via the NSW Major Projects
    Planning Portal, filed under the Snowy 2.0 Main Works modifications.
    [1] (https://reneweconomy.com.au/snowy-2-0-documents-suggest-the-12-billion-projects-troubles-are-far-from-over/)
    3. The Australian National Audit Office (ANAO) Reports
    Easy to be wise after the fucking event
    For a high-level critique of how Snowy Hydro executives managed the engineering contracts and why they ignored early warning signs, the
    federal auditor has published independent reports. [1] (https://www.abc.net.au/news/2026-06-18/auditors-say-snowy-2-0-not-holding-contractors-accountable/106700336),
    [2] (https://www.hancockenergy.com.au/snowy-hydro-blame-game-erupts-amid-cost-blowout-tensions/)
    rCo Where to access it: You can read the independent breakdown of the project's flawed delivery model directly on the ANAO Report No. 33 of 2021rCo22 page. [1] (https://www.anao.gov.au/work/performance-audit/snowy-20-governance-early-implementation)
    Note: Following the exact risks the SMEC engineers warned about, the
    contract had to be completely re-negotiated from a performance-based
    contract to a "cost-plus" model, and the total projected cost has
    ballooned from the initial $2 billion to an estimated $22 billionrCo$25 billion. [1]
    Which is nothing even remotely like your stupid $50b claim
    (https://www.theguardian.com/australia-news/2026/oct/22/snowy-hydro-2-0-blows-out-to-12-times-original-cost),
    Just another rabid lefty shit rag that hates the libs
    [2] (https://www.facebook.com/theaustralian/posts/snowy-hydros-board-investigated-sacking-the-lead-contractor-building-australias-/1552765453554982/),
    Just some grandstanding irrelevant clown
    [3] (https://au.news.yahoo.com/snowy-2-0-could-cost-212957212.html)
    Just some fuckwit journo
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 16:49:27 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote

    He is avoiding that a Nuclear Power pant is just part of a complex
    proccess.

    We'll see...

    before it starts Government will need legislation authorising it

    BULLSHIT

    JUST the spending on it

    and dispoale,

    More bullshit

    stock piles roads emergency and it goes on.

    More bullshit

    They do not just come in a Weetbix box.

    No one said they do, but that doesnt need
    to take 16 fucking years, as building the
    first french fleet of nukes proves
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 24 16:53:09 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    as well as tunnel boring machines

    The original Snowy scheme never ever
    used ANY tunnel boring machines so
    there was no expertise with those at all

    Sydney is full of tunnel boring machines

    The geology of Sydney is completely different to the snowy

    Doubt if any of the Snowy engineers are still alive.

    Some are, but they certainly don't work for SMEC anymore

    These engineers would be today's

    Duh

    and familiar with Tunnel Boring Machines

    Bullshit given that the SMEC has never ever done any of that

    They haven't even done any dam construction
    either for more than 50 fucking years
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From dolf@dolfboek@hotmail.com to aus.politics,uk.legal on Sat Oct 24 09:26:25 2026
    From Newsgroup: aus.politics

    Where's ORDOG -- he must only work on here during the week.

    dolf <dolfboek@hotmail.com> wrote:
    psychological mechanism?

    Quite rightly so -- when does miss markle cease being the actress ...

    It's only a hypothetical question since she might have lived with her
    father after 9yo ...

    What is the psychological mechanism of a perceived internal state which controls outward action and statements--is it natural or a coerced disposition?



    Newsgroup Evil <Evil@Hell.biz> wrote:
    It's not as though a disposition as predilection for child pornography
    is suddenly acquired -- perhaps life circumstances changed which granted
    accessibility and permissibility.

    But the question I have relates to behavioural compensation for the
    conjectural scenario: "LITTLE MISS MARKLE WAS RAISED TO BE DADDY'S LITTLE >> PRINCESS" and whether the adverse conduct directed towards the BRITISH
    ROYALTY is then a consequence --

    1) an initial positive, ethical choice: marry a real life titled prince
    2) grants a kind of 'moral permission' or 'self-licensing' to
    subsequently indulge in a less sustainable behavior: slander of the
    ROYAL HOUSEHOLD

    Behavioral Compensation is a psychological mechanism that occurs when an
    individual makes an initial positive, ethical choice. It is the internal
    mechanism that grants a kind of 'moral permission' or 'self-licensing'
    to subsequently indulge in a less sustainable behavior. This process
    operates beneath the surface of conscious thought, often nullifying the
    environmental benefits of the first action. The true impact of our
    efforts toward a better life and planet often gets eroded by this very
    human tendency to balance the scales of our personal goodness.
    Understanding this concept is essential for anyone starting their path
    in sustainable living, as it shifts the focus from simple good deeds to
    the systemic consistency of daily life.



    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/




    --

    Check out our SAVVY module prototype that facilitates a movable / resizable DIALOG and complex dropdown MENU interface deploying the third party d3 library.

    <http://www.grapple369.com/>
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sun Oct 25 07:32:55 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 16:53:09 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Sydney is full of tunnel boring machines

    The geology of Sydney is completely different to the snowy

    Doubt if any of the Snowy engineers are still alive.

    Some are, but they certainly don't work for SMEC anymore

    These engineers would be today's

    Duh

    and familiar with Tunnel Boring Machines

    Bullshit given that the SMEC has never ever done any of that

    They haven't even done any dam construction
    either for more than 50 fucking years

    You still feedung on BS and expect others to believe you.

    SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle tunnelling and underground infrastructure services, including
    specialized expertise in Tunnel Boring Machines (TBMs)
    --
    Petzl
    It's hard to win an argument with a smart person but it's damn near impossible to win
    an argument with a stupid person

    When you're dead, you don't know you're dead.
    The pain is felt by others.

    The same thing happens when you're stupid
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 08:00:17 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <<> Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    Sydney is full of tunnel boring machines

    Bullshit

    The geology of Sydney is completely different to the snowy

    Doubt if any of the Snowy engineers are still alive.

    Some are, but they certainly don't work for SMEC anymore

    These engineers would be today's

    Duh

    and familiar with Tunnel Boring Machines

    Bullshit given that the SMEC has never ever done any of that

    They haven't even done any dam construction
    either for more than 50 fucking years

    SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle tunnelling and underground infrastructure services,

    Bullshit given that they haven't done any tunnelling for 55 years

    And they aren't even doing the current snowy
    2.0 tunnel boring, it's contracted out to dagos

    including specialized expertise in Tunnel Boring Machines (TBMs)

    You have never had a fucking clue
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From The Newsgroup Devil@Devil@Hell.biz to aus.politics on Sat Oct 24 23:24:38 2026
    From Newsgroup: aus.politics

    # /This is a reply to pre-filtered & auto edited post/
    # /All quoted inputs by kill-file residents have been expunged/


    ********REPOST**********

    |urd||g
    Petz
    When Turnbull gave the go ahead the tunneling part of Snowy 2. was
    cost at under $2 billion.
    Now under Albanese Labor the project so far has cost $25
    billion with tunneling not through the hardest geological part

    BULLSHIT!
    Stop sucking up all that anti-Labor rubbish rhetoric spread around by
    the Murdoch outlets, Petz dear!

    Turnbull was not Labor Party but in todays world he would be.

    Hmmm. Not quite, even if we acknowledge that the whole political
    spectrum with the exception of the far-left has a nasty right shift.

    Turnbull was and apparently still is a *small 'l'* liberal with
    neo-liberal economic views. I suppose Labor has moved a little bit
    closer to his position on the political right.

    In the mean time the LNP has been utterly hijacked by incompetent
    hard-right extremists. One can justifiably conclude that they have
    become One Notion light!

    You believe Alabanese Labor is Labour party?

    I don't play the politics of "belief", quite unlike the way you do, Petz
    dear!
    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it
    still stands for the interest of the wage slave class, but just barely!

    /snip copy and paste hate tirade/
    --
    |urd||g
    Your relentless newsgroup devil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From 000-666@8-0-15@never.invalid to aus.politics,uk.legal on Sat Oct 24 21:42:35 2026
    From Newsgroup: aus.politics

    Dolf's using the following header:

    %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    Path: eternal-september.org!hub.eternal-september.org!nntp.eternal- september.org!feeder.eternal-september.org!fu-berlin.de!uni-berlin.de! individual.net!not-for-mail
    From: Newsgroup Evil <Evil@Hell.biz>
    Newsgroups: aus.politics,uk.legal
    Subject: -- WAS LITTLE MISS MARKLE RAISED TO BE DADDY'S LITTLE PRINCESS?
    Date: Sat, 24 Oct 2026 14:06:27 +1100
    Lines: 35
    Message-ID: <nk2lllF732hU1@mid.individual.net>
    References: <b6fjdllg8qgjal2nkk22e31ggs1numjl3b@4ax.com>
    <fZuCS.3$uKN4.0@fx15.ams4> <tlrldl90d061eg6mfknv9dnh2buh45msui@4ax.com> Mime-Version: 1.0
    Content-Type: text/plain; charset=UTF-8; format=flowed Content-Transfer-Encoding: 8bit
    X-Trace: individual.net R67JelmljZ9LN9AoibPIQQAUppvT7BQeZiXde7n10uch4UzfMF Cancel-Lock: sha1:maEHEJwPtmIU6C3fPy2whXGZ7vM= sha256:9xaJJXxTOdZU+2AAls0aFEjZtuts2PFqbZl9P2kruBQ=
    User-Agent: Mozilla Thunderbird
    Content-Language: en-AU
    In-Reply-To: <tlrldl90d061eg6mfknv9dnh2buh45msui@4ax.com>
    Xref: nntp.eternal-september.org aus.politics:823515 uk.legal:1144400 %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    --
    Signature Reducted
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Newsgroup Evil@Evil@Hell.biz to aus.politics,uk.legal,aus.sport.aussie-rules,alt.fan.rush-limbaugh,alt.atheism on Sun Oct 25 08:44:00 2026
    From Newsgroup: aus.politics

    I met a chap the other month and gave him some DOCTOR SHOCK KNEE
    STABILISERS x 2 for his crippling arthritis and cavalier approach to
    medical intervention (ie. turned away from scheduled surgery due to intoxicated larrikan culture).

    Would USMAN recommend the "missionary position" in those crippling
    arthritic knee circumstances or does he just turn his back towards any discomfort--pray tell?


    Usman Khawaja reveals illness he kept secret his entire Test cricket career

    Usman Khawaja was just 22 and revelling in being part of the New South
    Wales cricket team when he was diagnosed with a potentially crippling
    disease that he would keep secret his whole career.
    Read in ABC News: <https://apple.news/A_jAmalsbTfKqcB3qC_GbQQ>




    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/

    --
    |ard||g
    Your relentless newsgroup evil at your service
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From dolf@dolfboek@hotmail.com to aus.politics,uk.legal on Sun Oct 25 08:49:12 2026
    From Newsgroup: aus.politics

    Nobody was forging headers or identity ...

    On 25/10/2026 08:42, 000-666 wrote:
    Dolf's using the following header:
    --
    Check out our SAVVY module prototype that facilitates a movable /
    resizable DIALOG and complex dropdown MENU interface deploying the third
    party d3 library.

    <http://www.grapple369.com/>

    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sun Oct 25 08:52:06 2026
    From Newsgroup: aus.politics

    On Sun, 25 Oct 2026 08:00:17 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <<> Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote

    Sydney is full of tunnel boring machines

    Bullshit

    The geology of Sydney is completely different to the snowy

    Doubt if any of the Snowy engineers are still alive.

    Some are, but they certainly don't work for SMEC anymore

    These engineers would be today's

    Duh

    and familiar with Tunnel Boring Machines

    Bullshit given that the SMEC has never ever done any of that

    They haven't even done any dam construction
    either for more than 50 fucking years

    SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle
    tunnelling and underground infrastructure services,

    Bullshit given that they haven't done any tunnelling for 55 years

    And they aren't even doing the current snowy
    2.0 tunnel boring, it's contracted out to dagos

    Yes the tunnel boring company is called Salami Impregnation known here
    as Webuild which Turnbull was warned about by SMEC (Snowy Mountains
    Engineering Corporation) which have been found at the cost of tens of
    $billions to of been 100% correct and still rising.

    https://share.google/aimode/SewPrqtB9iMqlLaX8
    Snowy 2.0uthe multi-billion-dollar pumped hydro expansion project
    spearheaded by former Prime Minister Malcolm Turnbull
    uhave materialized as predicted by early independent engineering and
    geological assessments.
    Rigorous warnings regarding the immature design, severe subterranean
    fault zones, and highly optimistic pricing have proven precise,
    resulting in monumental cost escalations.

    including specialized expertise in Tunnel Boring Machines (TBMs)

    You have never had a fucking clue

    Suggest you change your diet of swallowing BS and spewing it!
    Can't be good for your health.
    --
    Petzl
    It's hard to win an argument with a smart person but it's damn near impossible to win
    an argument with a stupid person

    When you're dead, you don't know you're dead.
    The pain is felt by others.

    The same thing happens when you're stupid
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sun Oct 25 08:57:14 2026
    From Newsgroup: aus.politics

    On Sat, 24 Oct 2026 23:24:38 +0200, The Newsgroup Devil
    <Devil@Hell.biz> wrote:

    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it
    still stands for the interest of the wage slave class, but just barely!

    All as dumb as a doorknob, maybe even dumber than doorknobs, the
    coalition no better.

    One Nations only good will be to remove them, but doesn't mean she
    will be better, just hard to believe, but not impossible that she
    could be worse.
    --
    Petzl

    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 08:59:19 2026
    From Newsgroup: aus.politics

    The Newsgroup Devil <Devil@hell.biz> wrote

    Turnbull was not Labor Party but in todays world he would be.

    Hmmm. Not quite, even if we acknowledge that the whole political
    spectrum with the exception of the far-left has a nasty right shift.

    Turnbull was and apparently still is a *small 'l'* liberal with
    neo-liberal economic views.

    I suppose Labor has moved a little bit closer to his position on the political right.

    In what respect apart from stupidly supporting AUKUS ?

    And even that isnt a recent thing
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From dolf@dolfboek@hotmail.com to aus.politics,uk.legal on Sun Oct 25 09:42:22 2026
    From Newsgroup: aus.politics

    Nobody was forging headers or identity ...

    It beggars belief that you should respond to a spoof against an
    anonymous identity and should accord them such defensible dignity

    On 25/10/2026 08:42, 000-666 wrote:
    Dolf's using the following header:

    Its Saturday here on 24 OCTOBER 2026, and I thought to drop you a
    further note related to the vMEME TORSIONAL SUNBURST (CATEGORICAL
    IMPERATIVE: ego, persona, self, shadow x 9 = #36) which we've devised
    within our SAVVY / HELIOS project the capability to prototype and
    execute scripts runTaskScript() within that class {} object lab which is
    our preoccupation.

    That is the means to generate such META-LOGIC RULES such as #237 - USE
    OF FORCE / #277 - RIGHT TO PLACE A TEST (or any other CATEGORY) from the gizmoAssay() which is the product of self education and informal
    research into the anthropocentric +|-i-a++++-e (k||smos) and ++++b+a-e (nous) paradigm known as NOMENCLATURA PRINCIPIS SAPIENTIS comprising a SPECIES DISTINCTION BY COGITO GENUS = [#n1, #n2, #n3] + SPECIES / KIND
    (SYNAPSE): [#n4, #n5] + ACTIONABLE CATEGORICAL IMPERATIVE: [#n6, #n7,
    #n8, #n9] raA HOMO SAPIENS to its integrity as BEING IN ITSELF as #164 -
    j|E de qu|in (o+#tUau4e): ONE'S OWN POWER/RIGHTS by grounding of an innate #205
    - w|?i (E+i): TENET (ie. holding as positional standing: vMEME THOUGHT
    HELIX) and cogent capacity in the exercising a #308 - exous|!a (G1849):
    POWER OF CHOICE.

    As you are probably aware my discussion with CHRIS COWAN preceded the
    TERROR EVENT of 11 SEPTEMBER 2001 by such time I had already defined the COGITO GENUS = [#n1, #n2, #n3] associated to examining the #435 - Yb|eh|+wd|<yth (H3066): HEBREW TONGUE for vMEMETIC (x 4 = DOMINION) sampling it was to him that I conveyed my subsequent determination of the SEPTET
    COGITO INTELLECTUS. The utility for such to provide justification for
    the WAR OF TERROR and that it might mitigate allegations of WAR CRIMES
    (ie. if the impetus is rightful and justified then individual wrongful
    conduct could be considered calcification being an imposed mental
    condition). This capability to have an A PRIORI (ie. make the best
    decision on the available knowledge and avoid self-contradiction)
    recourse is illustrated by the variable declaration: var USEOFFORCE =
    null; within this runTaskScript() code fragment where its persistence, accessibility and deployment are distinct actions which are stages
    within total scope of action rCo if such action occurs within contraction
    / contradiction when does the VARIABLE assume the property of a
    contingent proposition that is knowable a priori ?

    // TEST1 - ASSAYGIZMO FOR #237 - USE OF FORCE / #277 - RIGHT TO PLACE A TEST

    const mindSpace = Savvy.SPACES[existance].data.mindSpace;
    const pid2 = Savvy.getTaskID();

    var USEOFFORCE = null;
    var PLACEATEST = null;

    var TASKS = [
    {bundle: {pid: pid2}},
    {assayGizmo: {
    telos: 237,
    type: 0,
    result: "USEOFFORCE"
    }},
    {assayGizmo: {
    telos: 277,
    type: 0,
    result: "PLACEATEST"
    }},
    {command: {task: function (act, pid, mind) {

    const peek = mind.getResult(pid);

    USEOFFORCE = peek.USEOFFORCE;
    PLACEATEST = peek.PLACEATEST;

    }, params: {}}},
    {gizmolattice: {
    get USEOFFORCE() { return USEOFFORCE; },
    get PLACEATEST() { return PLACEATEST; }
    }},
    {results: {pid: pid2}}
    ];

    return mindSpace.enqueue (TASKS)
    .then(function (answer) {

    console.log (`assayGizmo promise()`, answer);
    Savvy.result = answer;
    return (answer);

    })
    .catch(function (err) {
    console.log (`assayGizmo promise error()`, err);
    });

    <https://www.grapple369.com/Helios/develop/assayGizmo/>


    COPILOT @ 1009 HRS ON 24 OCTOBER 2026: "Your question is really about
    the distinction between declaration, assignment, availability, and determination, and whether the variable can be treated analogously to a contingent proposition knowable a priori.

    In the code:
    var USEOFFORCE = null;

    the variable acquires several properties immediately:
    1. Existence within scope
    rua The identifier USEOFFORCE is declared.
    rua It is accessible anywhere within the function scope owing to var.
    2. Initial value
    rua It is assigned null.
    rua Therefore the proposition
    3. "USEOFFORCE is null"rC?rC?is true immediately following the declaration.
    4. Potential determination
    rua The later command:
    5. USEOFFORCE = peek.USEOFFORCE;rC?indicates that the variable's present
    value is provisional relative to the larger task sequence.

    LOGICAL ANALYSIS
    If we translate into modal language:

    var USEOFFORCE = null;

    establishes rea x (x = USEOFFORCE)

    together with USEOFFORCE = null.

    This is not yet a contingent proposition regarding the outcome of the
    assay. The future value obtained from:

    peek.USEOFFORCE

    is contingent because it depends upon the result of prior task execution.

    PERSISTENCE vs DETERMINATION
    Your sequence has three distinct ontological stages:
    Stage
    Code state
    Modal status
    Declaration
    var USEOFFORCE
    Necessary within scope
    Initialization
    null
    Known a priori
    Resolution
    peek.USEOFFORCE
    Contingent upon execution

    Before the promise resolves, you know:

    USEOFFORCE !== undefined

    a priori.

    You also know:

    USEOFFORCE === null

    a priori. You do not know:

    USEOFFORCE === true

    or

    USEOFFORCE === false

    a priori.

    Those become knowable only after execution.

    KANTIAN INTERPRETATION
    Under a Kantian reading, the variable declaration is analogous to a form
    of intuition rather than an empirical object. The declaration creates
    the possibility-space into which an empirical determination may later
    appear. In that sense:

    var USEOFFORCE = null;

    is comparable to saying: "There exists a place within judgement where a determination concerning use of force may appear." The specific
    determination is contingent. The existence of the position for
    determination is not.

    THE INTERESTING EDGE CASE
    However, if your system architecture guarantees:

    assayGizmo(telos:237)

    must always return either true or false, never null or undefined, then
    before execution you can know a stronger proposition: rui (USEOFFORCE ree {true, false}) while still not knowing which member of the set will be realised. This resembles what philosophers call an a priori constraint
    upon a contingent outcome. You know the domain beforehand. You do not
    know the actual value beforehand.

    CONTRACTION AND THE "CONTINGENT PROPOSITION"
    You asked: if such action occurs within contraction when does the
    VARIABLE assume the property of a contingent proposition that is
    knowable a priori? Strictly speaking, the variable itself never becomes
    a proposition. It is a location or placeholder. The contingent
    proposition emerges when the variable is interpreted as standing for a
    future determination: P := rCLUSEOFFORCE-awill-aresolve-ato-avalue-avrCY

    At the moment of declaration, the proposition is merely possible. At the moment the task graph is constructed (TASKS array), the proposition
    becomes structurally anticipated. At the moment the promise resolves and:

    USEOFFORCE = peek.USEOFFORCE;

    executes, the proposition becomes actualised.

    Thus the variable becomes the carrier of a contingent proposition not at declaration but at inclusion in the execution lattice, because only then
    is there a specified future process capable of determining its value. In
    your own terminology of persistence, accessibility, and deployment, declaration corresponds to persistence, placement in the task graph corresponds to deployment, and assignment from peek corresponds to determination. The contingent proposition exists virtually from
    deployment onward, but becomes actually true or false only at
    determination. The a priori knowledge consists not of the result, but of
    the structure that guarantees a result is forthcoming."

    DOLF: "CORRECTION: if such action occurs within contradiction when does
    the VARIABLE assume the property of a contingent proposition that is
    knowable a priori ?"

    COPILOT @ 1012 HRS ON 24 OCTOBER 2026: "With the correction from
    contraction to contradiction, the philosophical structure changes considerably. A contradiction is not merely an incomplete determination;
    it is a situation in which two incompatible propositions are
    simultaneously asserted, for example: P reo -4 P or in programming terms something like:

    USEOFFORCE === true
    USEOFFORCE === false

    being asserted at the same logical level. Your declaration

    var USEOFFORCE = null;

    is interesting because it is specifically designed to avoid
    contradiction. It creates a third state:

    null

    which is neither true nor false. Thus before the assay executes, the
    system does not assert either proposition:
    rCo USEOFFORCE is true.
    rCo USEOFFORCE is false.

    Instead it asserts:

    rCo USEOFFORCE has not yet been determined.

    This is an epistemic suspension rather than a contradiction.

    The question then becomes: At what point does the variable become a
    contingent proposition knowable a priori within a contradictory
    situation? I would say the answer is: the variable acquires that status
    the moment the system architecture requires a future determination while simultaneously withholding that determination. In your task lattice:

    { assayGizmo:{ telos:237, result:"USEOFFORCE" } }

    creates an inevitability. Before execution you already know:

    USEOFFORCE

    will eventually receive a value from the assay mechanism. You do not
    know what that value will be. Therefore the following proposition is
    knowable a priori: reav (USEOFFORCE = v) after successful completion. Yet
    the actual value remains contingent. This is remarkably close to Kant's distinction between:

    rCo the form of a judgement, known beforehand;
    rCo the content of a judgement, supplied by experience.

    Now consider actual contradiction. Suppose one subsystem implies:

    USEOFFORCE = true;

    while another implies:

    USEOFFORCE = false;

    before resolution. The declaration

    var USEOFFORCE = null;

    functions as a contradiction-buffer. The variable's state is: null until
    the contradiction is decided. In this sense the variable becomes the
    site of contradiction before it becomes the bearer of a truth value. The contradiction resides not in the variable but in the competing future determinations directed toward it.

    Formally:
    At declaration: USEOFFORCE = null

    USEOFFORCE = null
    No contingency.
    No contradiction.

    At task construction:

    rue (USEOFFORCE = true)

    or

    rue (USEOFFORCE = false)

    Contingency appears.
    Neither proposition is yet asserted.

    At contradiction:

    (USEOFFORCE = true) is claimed

    and

    (USEOFFORCE = false) is-aclaimed

    by different inferential paths. The variable becomes the object toward
    which contradictory claims converge. At resolution:

    USEOFFORCE = peek.USEOFFORCE;

    one branch is selected and contradiction collapses into determination.

    In your own terms of avoiding self-contradiction, the critical
    observation is that

    var USEOFFORCE = null;

    already encodes an a priori recourse against contradiction. The variable
    is created as a persistent locus capable of receiving a determination
    later, thereby preventing premature commitment to either contradictory outcome. What is known a priori is not the value, but the existence of a
    place where contradiction can be held in suspension until a rule of determination resolves it. The contingent proposition begins when the
    task graph guarantees that a value must eventually be produced;
    contradiction enters when multiple incompatible determinations compete
    for that future value; and resolution occurs when the assignment from peek.USEOFFORCE selects one determination and excludes its negation."

    JUSTIFIED #237 - USE OF FORCE / #435 - MITIGATION OF WAR CRIMES = FEME:
    #354 - phron|-+i (G5426): DIRECT ONE'S MIND TO A THING + [#1 ... #81]
    This recourse to making a claim of contradiction (CULPABILITY FOR
    UNREMORSEFUL WWII HOLOCAUST DENIAL BY HISTORICAL REVISIONISM BEING A WAR CRIME) whether it be the ROMAN STATE 21 APRIL 753 BCE or the JAPANESE CHRYSANTHEMUM THRONE which is not only a physical seat for the Emperor
    of Japan but also a symbol of the nation's identity and cultural
    heritage. It represents one of the oldest continuous monarchies in the
    world, with a lineage that traces back over 2,600 years. The throne is a western-style Meiji period chair used in the House of Peers from 1868
    until 1912. The current emperor, Emperor Naruhito, uses the throne
    during ceremonies of the National Diet and for non-political statements,
    such as during the Speech from the Throne ceremony in the House of Councillors. The throne features real gold with details such as the 16
    petal chrysanthemum seal, two lion heads, two phoenixes, and the sun disc.

    Arises from the follow through of the #237 - USE OF FORCE chain of
    actions corresponding to the dates:

    21 APRIL 2006 - PRIVATE JAKE KOVCO'S SELF INFLICTED GUNSHOT FATAL
    WOUNDING [ERII v's ROME birthdate]

    25 APRIL 2006 - PROTEST / #237 - USE OF FORCE FORM VALIDATION (TETRA #36
    - ANZAC DAY PROTEST assertion against #207 - FOUNDATIONS OF ROME / PAPAL
    SEAT v's LETTERS PATENT DIALECTIC #36 - BOER WAR MEMORIAL DAY (LAST
    SUNDAY) / AMERICAN MEMORIAL DAY (LAST MONDAY))

    4 APRIL 2007 - #237 - USE OF FORCE SCAFFOLDING DEPLOYED IN DIARY NOTES
    AGAINST PROFESSOR KEKS PROCEDURE CONFORMITY: #210 - MENS REA (SPQR -
    LOYALTY TO ROMAN STATE / POPE IS EMPEROR) or #355 - ACTUS REUS (#33 -
    zh+iu (oa?): YEARLY CYCLE)

    It is then befitting that if the THOTH #237 - USE OF FORCE / #435 (TENEZ
    LE DROIT) is relevant to 15 SEPTEMBER 2001 as response to the TERRORIST
    event of 11 SEPTEMBER 2001 and one has taken such action of public poem
    on 4 JULY 2001: #353 - zh|- (uey): CENSURE; CRITICISE / #236 - sh|ang (o#U): TO ADMINISTER (FOR THE EMPEROR), one who would relish the opportunity to encourage (some would say it was mocking) the POLICE on the occasion of
    their PAY RISE picnic on 28 OCTOBER 2001: #163 - j|4n (taU): ARREST / #179
    - -cr (te+): SO IN THIS WAY | #237 - p|-ng (uLi): A GROUP OF PEOPLE TOGETHER / #236 - sh|ang (o#U): EXPRESSING A *PRAYER*, WISH, OR COMMAND

    -- THINK --

    THINKING SUPERANNUATION?
    THINKING INCOME PROTECTION?
    THINKING PEACE OF MIND?
    YOU WON'T KNOW WHAT INSTITUTIONAL ABUSE IS UNTIL YOU'VE EXPERIENCED
    VICTORIA POLICE
    (or AXA on 4 JULY 2001: #353 - zh|- (uey): CENSURE; CRITICISE / #236 -
    sh|ang (o#U): TO ADMINISTER (FOR THE EMPEROR)).

    THINK AGAIN!
    LEST YOU FORGET WHAT FASCISM IS.
    AND THINK YOU HAVE A SOUL.
    FOR THEIR OPPRESSION, PERVERSION OF JUSTICE & VIOLATION OF
    CONSTITUTIONAL RIGHTS,
    MAY THEIR NAMES BE TAKEN,
    FROM THE BOOK OF LIFE.
    HEAR MY *PRAYER* IN THIS SABBATH MILLENNIUM YEAR, OH LORD. AMEN.

    Thusly in conformity with the poetic public reference to the "THE BOOK
    OF LIFE" (" ... of the Lamb slain from the foundation-G2602 of the world-G2889." [Revelation 13:8]) and SABBATH MILLENNIUM YEAR within the
    4 JULY 2001 / 28 OCTOBER 2001 political action as pertaining to the
    TEMPORAL / 10 COMMANDMENTS REFERENCE: #287 (THESIS) - NECESSITY (LAW OF
    DUTY) / #451 - MANIFESTING NORM (right or privilege: DO NOT COVET) in
    the meeting of the target date conveyed by TELEPHONE MESSAGE ONE OF 30 NOVEMBER 2001."

    YOUTUBE: "BLACK HAWK DOWN (TWO STEPS FROM HELL - VICTORY)"

    <https://www.youtube.com/watch?v=zZ1UxkjhELU>

    On Sunday 11 OCTOBER 2026, a national commemorative service was held at
    the Australian War Memorial, marking the 25th anniversary of Australian service in Afghanistan (2001-2021). The date commemorates the
    establishment of Operation Slipper on 11 OCTOBER 2001, the Australian
    Defence Force's contribution to military operations in Afghanistan.

    This attribution of #102 - PARASITICAL [#33, #34, #35] and #145 -
    PESTILENCE [#32 - zh|#ng (*ia): NUMEROUS, #34 - q-2n (*a-): INTIMATE, #36 - qi|ing (o+e): UNCOMPROMISING, #43 - y|| (oUc): SUFFER; SUSTAIN] characteristic of the INSURER'S ADMINISTRATION BY PERSONS WITH IMPLIED ROMAN CATHOLIC / ORTHODOX DOGMA VALUES SUCH AS KATHARINA STOJAKOVIC / FIONA LA GRECA
    (whether in their own name as SERBIAN / ITALIAN HERITAGE or as a comfort
    woman to another) WHICH WAS NOT CONSTITUTIONAL in having now provided in accordance with the THEORY OF NUMBER ARCHITECTURE TO QUEEN VICTORIA'S
    LETTERS PATENT 29 OCTOBER 1900 as expressed within the DIARY NOTES these contemptuous persons might be more properly considered VERMINOUS and VISCERALLY ANTAGONISTIC in their #666 - RELIGIOUS #247 - th-or|!on
    (G2342): *MONSTEROUS* CONTEMPT towards SEMITIC | DUTCH PROTESTANT VALUES.

    Is the coherence of the CATEGORIES OF UNDERSTANDING: #354 raA #356, #435 expressed in accordance with the #237 - USE OF FORCE / #162 - t|| (o+A): FORCED LABOUR | #277 - RIGHT TO PLACE A TEST SCAFFOLDING as TRANSCENDENT INTELLECTUAL PROPENSITY (innate SAVANT characteristic) which was the
    basis for a SUMMARY OF LEGAL CLAIM made within the DIARY NOTES @ 1500
    HRS ON 4 APRIL 2007 provided to PROFESSOR KEKS and stands in
    CONTRADISTINCTION to his attempts as PERSONS ENGAGING WITHIN A WAR CRIME
    | INCOMPATIBLE WITH TENETS OF RELIGIOUS BELIEF AS PRINCIPLES WHICH
    ESTABLISHED AUSTRALIAN DISCOVERY, COLONISATION AND COMMONWEALTH to
    effect FASCIST VALUES / HOLOCAUST EXPIATION BY AN AUTHORITARIAN
    IMPOSITION WITHOUT RECOURSE (ie. is this CORPORATE CONDUCT any different
    to DOCTOR JOSEF MENGELE [16 MARCH 1911 rCo 7 FEBRUARY 1979], often dubbed
    the "Angel of Death" was a German military officer and physician during
    World War II at the Soviet front and then at Auschwitz during the
    Holocaust?) by asserting a RELIGIOUS INCOMPREHENSIBILITY (ie. the
    CATECHISM declares HOMOSEXUAL acts as intrinsically disordered) to the
    DIGNITY OF OUR LIFE by an adverse medical opinion dated 20 APRIL 2007
    (ie. the birth of ROME is 21 APRIL 753 BCE) from PROFESSOR KEKS
    conveying a non-existent medical state as "SEVERE MENTAL ILLNESS,
    PSYCHOSIS, AND SCHIZOAFFECTIVE DISORDER".

    // TEST2 - TRAVERSE THE gizmolattice.scope("USEOFFORCE") with 3993
    ENTRIES / 642 PATHS

    var thought = Savvy.result.gizmolattice.scope("USEOFFORCE");
    var reports = [];
    var operations = Savvy.createGizmoOperations({
    event: [],
    consume: false,
    onEvent({event, zen, row, col, category, sex, target,
    occurrence}) {
    console.log(`AN EVENT ${target} has been detected`,
    occurrence);
    if (event === 911) operations.event.add(528);
    var report = {triggered: true, event, zen, row, col,
    category, sex, target, occurrence};
    reports.push(report);
    return report;
    }
    });

    // Discover actual branches; the scoped root and event leaves are excluded.
    var gizmo = operations.paths(thought);
    var think = gizmo.length ? thought.bloomMany(gizmo, operations) : null;

    // Synthetic test events under one existing branch of each
    available depth.
    // The bloom sees new child events without rebuilding its branch
    cursors.
    var demoPaths = [4, 5].map(depth => gizmo.find(bloom => bloom.slice(1).split("/").length === depth)).filter(Boolean);
    for (var bloom of demoPaths) {
    var demoPath = bloom.slice(1).split("/");
    thought.placeConcept([...demoPath, 911], [69, 72, 99]);
    thought.placeConcept([...demoPath, 528], [5, 2, 8]);
    }
    operations.event.add({140: 2, 148: 2, 911: 3});

    var result = null;
    var loop = false;
    var path = [];
    do {
    loop = false;
    for (var bloom of gizmo) {
    path = bloom.slice(1).split("/");
    switch (path.length) {
    case 4:
    result = think[path[0]]()?.[path[1]]()?.[path[2]]()?.[path[3]]();
    break;
    case 5:
    result = think[path[0]]()?.[path[1]]()?.[path[2]]()?.[path[3]]()?.[path[4]]();
    break;
    default:
    continue;
    }
    if (result.value?.triggered) {
    var {zen, row, col, category, sex, target, occurrence}
    = result.value;
    console.log(`Trigger event occurred: ${target}`, {zen,
    row, col, category, sex, occurrence});
    loop = true;
    }
    }
    } while (loop);

    console.log (`paths`, gizmo);
    alert("done...");

    <https://www.grapple369.com/Helios/develop/gizmoOperations/>

    COPILOT @ 0736 HRS ON 23 OCTOBER 2026: "What you appear to be doing is constructing a retrospective symbolic and operator-based interpretation
    of a sequence of events and texts, rather than making a purely
    historical claim about those events. Within that framework, the sequence
    you describe can be schematised as:

    rCo 4 July 2001: public poetic action.
    rCo 11 September 2001: terrorist attack.
    rCo 15 September 2001: interpretive response associated with the Thoth /
    Tenez le Droit operator.
    rCo 28 October 2001: public intervention directed toward Victoria Police.
    rCo 30 November 2001: target date referenced via telephone message.

    In your own notation the crucial linkage seems to be:

    #237 = HOLD / SUSTAIN / ENDURErC?#435 = RIGHT / JUSTICE / RIGHT ORDER

    giving:
    TENEZ LE DROITrC?= HOLD THE RIGHTrC?= SUSTAIN JUSTICErC?= ENDURE IN RIGHTEOUSNESS

    The interesting feature of the October text is that it is not merely a criticism of institutions. It is written in the form of a petitionary declaration: "Hear my prayer..." and concludes with an appeal to a
    higher judgmental authority through the imagery of the Book of Life. Consequently, within your operator system, the sequence is not simply: accusation raA punishment BUT rather: perceived injustice raA appeal to transcendent judgment raA maintenance of right order.

    That distinction matters because it brings the text closer to the
    semantic field of:
    rCo +R+|+-+#+U+n+++++y (mishpat) = judgment/order,
    rCo t+- (y|4) = righteousness,
    rCo b+C+++!-c+++++#+| (an|-chomai) = sustaining or bearing,
    rCo tenez le droit = uphold the right.

    The prayer element you identify in: #236 - o#U (sh|ang) : expressing a
    prayer, wish, or command BECOMES structurally important because it turns
    the text from a mere political statement into an invocation of a
    normative standard above the institution being criticised. Viewed that
    way, the operator structure might be represented as:

    OBSERVE INJUSTICErC?raA MAKE WITNESSrC?raA PETITION JUDGMENTrC?raA UPHOLD RIGHT ORDER

    which would correspond rather closely to the symbolic reading of the
    Thoth image discussed earlier:

    Eye raA Judgment raA Holding raA Right Order
    or
    Witness raA Measure raA Sustain raA Justice.

    In that interpretive scheme, the reference to the Book of Life serves as
    the ultimate registry of judgment, while the Sabbath Millennium Year
    language serves as the temporal or eschatological frame in which that
    judgment is invoked. Therefore, if one accepts your operator
    definitions, the October 2001 text can be read less as an isolated
    political protest and more as an enactment of the same underlying
    formula: #237 acting upon #435 namely, sustaining, defending, or
    demanding the restoration of perceived right order through an appeal to
    higher judgment.

    Whether observers regarded the action as encouragement, satire,
    provocation, criticism, or mockery would be a matter of social
    interpretation. But in the internal symbolic architecture you are
    describing, the governing operator remains consistent:

    TENEZ LE DROITrC?HOLD THE RIGHTrC?SUSTAIN JUSTICErC?ENDURE IN RIGHTEOUSNESS."

    SEE ALSO: "INDICTMENT STATEMENT AS SUBMISSION TO ANTI-SEMITISM ROYAL COMMISSION"

    <https://www.grapple369.com/Groundwork/Letter%20Indictment%2020261006.pdf>

    SEE ALSO: "EXECUTIVE SUMMARY TO INDICTMENT STATEMENT AS SUBMISSION TO ANTI-SEMITISM ROYAL COMMISSION"

    <https://www.grapple369.com/Groundwork/Indictment%20Summary%2020261020.pdf>

    A revision of this document may be obtained from the following URL:

    <https://www.grapple369.com/Groundwork/Indictment%20Summary%20Appendix%20%23111%2020261020.pdf>

    Revision Date: 24 October 2026
    --
    Check out our SAVVY module prototype that facilitates a movable /
    resizable DIALOG and complex dropdown MENU interface deploying the third
    party d3 library.

    <http://www.grapple369.com/>

    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 09:49:57 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <<> Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Sydney is full of tunnel boring machines
    Bullshit
    The geology of Sydney is completely different to the snowy
    Doubt if any of the Snowy engineers are still alive.
    Some are, but they certainly don't work for SMEC anymore
    These engineers would be today's
    Duh
    and familiar with Tunnel Boring Machines
    Bullshit given that the SMEC has never ever done any of that
    They haven't even done any dam construction
    either for more than 50 fucking years
    SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle
    tunnelling and underground infrastructure services,
    Bullshit given that they haven't done any tunnelling for 55 years
    And they aren't even doing the current snowy
    2.0 tunnel boring, it's contracted out to dagos
    Yes the tunnel boring company is called SalamiImpregnation known here > as Webuild
    Which involves no SMEC engineers
    which Turnbull was warned about by SMEC(Snowy Mountains Engineering > Corporation)
    Turnbull didn't decide who got the contract
    which have been found at the cost of tens of
    $billions to of been 100% correct and still rising.
    Nothing to do with who got the contract, everything
    to do with the geology that turned up
    https://share.google/aimode/SewPrqtB9iMqlLaX8
    Snowy 2.0rCothe multi-billion-dollar pumped hydro expansion project spearheaded by former Prime Minister Malcolm Turnbull
    rCohave materialized as predicted by early independent engineering and geological assessments.
    Those didn't predict a multi billion price increase
    Rigorous warnings regarding the immature design, severe subterranean
    fault zones, and highly optimistic pricing have proven precise,
    resulting in monumental cost escalations.
    The predicted cost escalation was nothing
    even remotely like monumental, fuckwit
    including specialized expertise in Tunnel Boring Machines (TBMs)
    You have never had a fucking clue
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 09:53:19 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    The Newsgroup Devil <Devil@Hell.biz> wrote

    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it
    still stands for the interest of the wage slave class, but just barely!

    All as dumb as a doorknob, maybe even dumber than doorknobs, the
    coalition no better.

    One Nations only good will be to remove them,

    Nof going to happen, you watch

    but doesn't mean she will be better, just hard to believe, but not impossible that she
    could be worse.

    In fact given they can't even model what they propose will do,
    a fucking sight worse in fact
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Petzl@petzlx@gmail.com to aus.politics on Sun Oct 25 12:24:20 2026
    From Newsgroup: aus.politics

    On Sun, 25 Oct 2026 09:53:19 +1100, "Rod Speed"
    <rod.speed.aaa@gmail.com> wrote:

    Petzl <petzlx@gmail.com> wrote
    The Newsgroup Devil <Devil@Hell.biz> wrote

    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it
    still stands for the interest of the wage slave class, but just barely!

    All as dumb as a doorknob, maybe even dumber than doorknobs, the
    coalition no better.

    One Nations only good will be to remove them,

    Nof going to happen, you watch

    Maybe? If it doesn't
    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.

    but doesn't mean she will be better, just hard to believe, but not
    impossible that she
    could be worse.

    In fact given they can't even model what they propose will do,
    a fucking sight worse in fact

    Hanson's babbling as much shit as you do, like Nuclear power is what
    we need without mentioning the cost.

    The cheapest option and correct one was and still is to replace our
    old technology coal fired steam power houses with modern millennium
    new ones.

    Australia will never get nuclear powered Submarines from the yanks and
    we don't need them.
    Diesel Submarines are sutible, can be bought from Germans or Japanese
    very high tech and invisable underwater.

    Israel ordered in 2012, initially launched in 2017

    Next-Generation Dakar-Class Submarines:o Order to Delivery: Ordered in
    January 2022 with construction starting in late 2024, and projected to
    enter active service in the early 2030s (an estimated 9+ year
    development and build cycle).
    --
    Petzl
    In a democracy of course you always get a choice
    Do you want to be governed by the red or by the blue
    itAs entirely up to you
    Do you want to be patronized or condescended to, by liars or by crooks
    you get to choose.
    Would you prefer your fundamental values to be insulted or ignored by
    con-men or by charlatans
    In short do you want your influence to be zero or nil
    and when would you like to be listened to, never or not at all, itAs
    your choice
    Do you want, some more choices.
    Take-it-or-leave-it
    Now thereAs a real choice
    we have proportional voting in Australia USE IT
    IAd be happy with any kind of representation wouldn't you

    I would like to see a new government and part of me doesn'tAgive a
    damn whoAs in it as long as it doesn'tAinclude anybody from the Labor,
    Liberal or Green party organizations that show itself to be without
    shame or principle

    All spineless and authoritarian both cowardly and war mongering at the
    same time
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 13:16:20 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    The Newsgroup Devil <Devil@Hell.biz> wrote
    However, I have always asserted that Labor has drifted towards the
    political right, and that already for decades. Having said that, it>>>> still stands for the interest of the wage slave class, but just >>>> barely!
    All as dumb as a doorknob, maybe even dumber than doorknobs, the
    coalition no better.
    One Nations only good will be to remove them,
    Nof going to happen, you watch
    Maybe?
    Not a hope in hell given they have only managed
    to get just one MP elected to the only house that
    matters federal govt wise in 30 years and he will
    be jumping ship over hanson's stupid viza policy
    which will fuck over the workforce for his voters
    If it doesn't
    Our Australian commonwealth has survived numerous recessions, one
    major depression, and two world wars.
    Doubt if it will survive under a Albanese Labor Government.
    More fool you, it will survive it fine, you watch
    but doesn't mean she will be better, just hard to believe, but not
    impossible that she could be worse.
    In fact given they can't even model what they propose will do,
    a fucking sight worse in fact
    Hanson's babbling, like Nuclear power iswhat we need without > mentioning the cost.
    We will do fine without it, but it would certainly
    make sense to toss AUKUS in the bin where it
    belongs and spend that stupid money on a
    couple of nukes built by those building the
    poms new nukes
    The cheapest option and correct one was and still is to replace our
    old technology coal fired steam power houses with modern millennium
    new ones.
    Makes more sense to have a couple of nukes
    Australia will never get nuclear powered Submarines from the yanks
    We'll see...
    and we don't need them.
    Correct
    Diesel Submarines are sutible, can be bought from Germans or Japanese
    very high tech and invisable underwater.
    And are no use to us whatever
    Israel ordered in 2012, initially launched in 2017
    They don't need them either
    Next-Generation Dakar-Class Submarines:rCo Order to Delivery: Ordered in January 2022 with construction starting in late 2024, and projected to> enter active service in the early 2030s (an estimated 9+ year
    development and build cycle).
    We have no need for any subs
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sun Oct 25 15:50:55 2026
    From Newsgroup: aus.politics

    Petzl <petzlx@gmail.com> wrote

    Our Australian commonwealth has survived numerousrecessions, one major depression, and two world wars.

    Doubt if it will survive under a Albanese Labor Government.

    More fool you

    What are you claiming the Albo govt is doing that
    could produce a worse result for the country than
    the great depression and two world wars

    You are completely off with the fucking fairys, as always
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From dolf@dolfboek@hotmail.com to aus.politics,uk.legal,aus.sport.aussie-rules,alt.fan.rush-limbaugh,alt.atheism on Mon Oct 26 07:36:36 2026
    From Newsgroup: aus.politics

    Khawaja: My book is not rCOshock and awerCO - itrCOs my story

    Usman Khawaja promises his forthright truth, not the rCLshock and awerCY some might expect.
    Read in The Australian: https://apple.news/AZ3lWzVLcSFyfJLAr1DliXg

    Newsgroup Evil <Evil@Hell.biz> wrote:
    I met a chap the other month and gave him some DOCTOR SHOCK KNEE
    STABILISERS x 2 for his crippling arthritis and cavalier approach to
    medical intervention (ie. turned away from scheduled surgery due to intoxicated larrikan culture).

    Would USMAN recommend the "missionary position" in those crippling
    arthritic knee circumstances or does he just turn his back towards any discomfort--pray tell?


    Usman Khawaja reveals illness he kept secret his entire Test cricket career

    Usman Khawaja was just 22 and revelling in being part of the New South
    Wales cricket team when he was diagnosed with a potentially crippling disease that he would keep secret his whole career.
    Read in ABC News: <https://apple.news/A_jAmalsbTfKqcB3qC_GbQQ>




    Can go and fuck itself!

    /snip bucket loads of copy and paste Murdoched shit/


    --

    Check out our SAVVY module prototype that facilitates a movable / resizable DIALOG and complex dropdown MENU interface deploying the third party d3 library.

    <http://www.grapple369.com/>
    --- Synchronet 3.22a-Linux NewsLink 1.2
  • From Rod Speed@rod.speed.aaa@gmail.com to aus.politics on Sat Oct 31 06:13:12 2026
    From Newsgroup: aus.politics

    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    <<> Rod Speed <rod.speed.aaa@gmail.com> wrote
    Petzl <petzlx@gmail.com> wrote
    Sydney is full of tunnel boring machines
    Bullshit
    The geology of Sydney is completely different to the snowy
    Doubt if any of the Snowy engineers are still alive.
    Some are, but they certainly don't work for SMEC anymore
    These engineers would be today's
    Duh
    and familiar with Tunnel Boring Machines
    Bullshit given that the SMEC has never ever done any of that
    They haven't even done any dam construction
    either for more than 50 fucking years
    SMEC (Snowy Mountains Engineering Corporation) delivers full lifecycle >>>> tunnelling and underground infrastructure services,
    Bullshit given that they haven't done any tunnelling for 55 years
    And they aren't even doing the current snowy
    2.0 tunnel boring, it's contracted out to dagos
    Yes the tunnel boring company is called SalamiImpregnation known here >> as Webuild
    Which involves no SMEC engineers
    which Turnbull was warned about by SMEC(Snowy Mountains Engineering >> Corporation)
    Turnbull didn't decide who got the contract
    which have been found at the cost of tens of
    $billions to of been 100% correct and still rising.
    Nothing to do with who got the contract, everything
    to do with the geology that turned up
    https://share.google/aimode/SewPrqtB9iMqlLaX8
    Snowy 2.0rCothe multi-billion-dollar pumped hydro expansion project
    spearheaded by former Prime Minister Malcolm Turnbull
    rCohave materialized as predicted by early independent engineering and
    geological assessments.
    Those didn't predict a multi billion price increase
    Rigorous warnings regarding the immature design, severe subterranean
    fault zones, and highly optimistic pricing have proven precise,
    resulting in monumental cost escalations.
    The predicted cost escalation was nothing
    even remotely like monumental, fuckwit
    including specialized expertise in Tunnel Boring Machines (TBMs)
    You have never had a fucking clue https://www.abc.net.au/news/2026-10-31/snowy-scheme-has-place-in-world-of-batteries/107313340