• All Aboard!

    From Alexandria Ocrazyo Crockpot@aoc@CR0CKP0T.C0M to alt.home.repair on Sat Aug 15 17:33:23 2026
    From Newsgroup: alt.home.repair

    This is a multi-part message in MIME format. --------------TLbyVskSCc0aOAARdn4J5L63
    Content-Type: text/plain; charset=UTF-8; format=flowed Content-Transfer-Encoding: 8bit

    Ben Bergquam Exposes the Fraudulent California High-Speed Rail to Nowhere Costing Billions of Dollars rCo (VIDEO)


    Real AmericarCOs Voice and host of rCLLaw and Border,rCY Ben Bergquam was reporting on the massive fraud for the California High-Speed Rail.

    He explained that the concept, which began in 2008, was supposed to be completed in 2020. With billions of dollars wasted, the project is
    nowhere near finished in 2026.

    rCLBack up here, on whatrCOs supposed to be the California High-Speed Rail, projected in 2008 to cost $33 billion and be done by 2020,rCY Bergquam said.

    rCLIt is now 2026, and this stretch that has been built for about 10 years outside of Fresno still doesnrCOt have a single track on it. The best
    example of one of the worst projects ever done by Democrats, and they are still doing it,rCY Bergquam continued.

    rCLIt could easily get to half a trillion dollars, and they donrCOt care because you are paying for it,rCY Bergquam said.

    https://www.thegatewaypundit.com/2026/08/ben-bergquam-exposes-fraudulent-incomplete-california-high-speed/

    Democrats are always screwing the taxpayers. Why do you lefty clowns keep voting for them?


    --------------TLbyVskSCc0aOAARdn4J5L63
    Content-Type: text/html; charset=UTF-8
    Content-Transfer-Encoding: 8bit

    <!DOCTYPE html>
    <html>
    <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
    </head>
    <body>
    <p>Ben Bergquam Exposes the Fraudulent California High-Speed Rail to
    Nowhere Costing Billions of Dollars rCo (VIDEO)</p>
    <p><br>
    </p>
    <p>Real AmericarCOs Voice and host of rCLLaw and Border,rCY Ben Bergquam
    was reporting on the massive fraud for the California High-Speed
    Rail.<br>
    <br>
    He explained that the concept, which began in 2008, was supposed
    to be completed in 2020. With billions of dollars wasted, the
    project is nowhere near finished in 2026.<br>
    <br>
    rCLBack up here, on whatrCOs supposed to be the California High-Speed
    Rail, projected in 2008 to cost $33 billion and be done by 2020,rCY
    Bergquam said.</p>
    <p>rCLIt is now 2026, and this stretch that has been built for about
    10 years outside of Fresno still doesnrCOt have a single track on
    it. The best example of one of the worst projects ever done by
    Democrats, and they are still doing it,rCY Bergquam continued.</p>
    <p>rCLIt could easily get to half a trillion dollars, and they donrCOt
    care because you are paying for it,rCY Bergquam said.</p>
    <p><a class="moz-txt-link-freetext" href="https://www.thegatewaypundit.com/2026/08/ben-bergquam-exposes-fraudulent-incomplete-california-high-speed/">https://www.thegatewaypundit.com/2026/08/ben-bergquam-exposes-fraudulent-incomplete-california-high-speed/</a></p>
    <p>Democrats are always screwing the taxpayers. Why do you lefty
    clowns keep voting for them?</p>
    <p><br>
    </p>
    </body>
    </html>

    --------------TLbyVskSCc0aOAARdn4J5L63--
    --- Synchronet 3.22a-Linux NewsLink 1.2