• UK data centre operators report electrical disruption...

    From Mike Powell@1:2320/107 to All on Wed Nov 18 10:07:40 2026
    [Back a few years ago, before the push to build data centers, wasn't it a "known thing" (that seemed to worry a lot of Republicans/MAGA) that the US power grid already had "issues"? Or am I remembering that wrong?]

    New report finds nearly all UK data centre operators report electrical disruption as 'critical bottleneck' looms

    Date:
    Tue, 17 Nov 2026 13:15:00 +0000

    Description:
    The average new or expanded UK data center is waiting 14 months for an electrical supply, compared with 12 months globally.

    FULL STORY
    One in four say they only discovered an electrical problem after a
    failure or downtime -- Four in five (79%) UK data center operators have blamed electrical or power-system issues for major disruptions, delays or downtime, leaving just 17% confident that they're fully-prepared for future AI workloads, new Fluke research has claimed.

    And these challenges are already impacting operations, with around a third (32%) reporting that power problems have already limited their abilities to deploy high-density GPUs and AI workloads. This is especially alarming given that the UK is targeting 6GW of data center capacity by the end of the decade spanning multiple large-scale AI Growth Zones.

    With electrical infrastructure now seen as one of the biggest
    bottlenecks, only 41% say they have real-time visibility across their
    critical electrical systems. A further quarter (26%) say they only discovered electrical problems after a failure or downtime.

    But it's not just the power infrastructure that's problematic many operators are struggling to hire enough talent, with half (51%) admitting recruiting electrical technicians has become harder. Two in five (38%) say this has directly delayed infrastructure upgrades because they don't have the right people to lead an upgrade team.

    As for new projects or expansions, operators are now seeing an average of 14 months to wait for additional grid connections or power capacity two months longer than the UK average.

    "As AI drives unprecedented demand for computing capacity, the electrical infrastructure inside data centres is becoming a critical bottleneck," Fluke Corporation President Parker Burke summarized.

    Looking ahead, the fact that the UK is falling behind the global average
    poses serious questions as to whether it can deliver on its 2030 AI targets. With grid constraints and skills shortages both threatening fast enough expansion, a more harmonious strategy involving the energy sector is clearly needed.

    Link to news story: https://www.techradar.com/pro/new-report-finds-nearly-all-uk-data-centre-opera tors-report-electrical-disruption-as-critical-bottleneck-looms

    $$
    --- MultiMail/DOS
    * Origin: capitolcityonline.net * KY, USA (1:2320/107)
  • From Kurt Weiske@1:218/700 to Mike Powell on Thu Nov 19 07:24:55 2026
    Mike Powell wrote to All <=-

    [Back a few years ago, before the push to build data centers, wasn't
    it a "known thing" (that seemed to worry a lot of Republicans/MAGA)
    that the US power grid already had "issues"? Or am I remembering that wrong?]

    Electric cars were going to take down the grid. Best to drive cars
    fueled by gasoline.



    --- MultiMail/Win v0.52
    * Origin: http://realitycheckbbs.org | tomorrow's retro tech (1:218/700)
  • From Mike Powell@1:2320/107 to Kurt Weiske on Fri Nov 20 10:56:40 2026
    Kurt Weiske wrote to Mike Powell <=-

    Mike Powell wrote to All <=-

    [Back a few years ago, before the push to build data centers, wasn't
    it a "known thing" (that seemed to worry a lot of Republicans/MAGA)
    that the US power grid already had "issues"? Or am I remembering that wrong?]

    Electric cars were going to take down the grid. Best to drive cars
    fueled by gasoline.

    Maybe they were right about that after all. :O


    ... "Tryin' is the first step towards failure." - Homer
    --- MultiMail/DOS
    * Origin: capitolcityonline.net * KY, USA (1:2320/107)