• CityFibre connection getting nearer (I hope)

    From Chris Green@cl@isbd.net to uk.telecom.broadband on Thu Aug 14 13:56:27 2025
    From Newsgroup: uk.telecom.broadband

    Last night after we had gone to bed we heard people talking outside,
    as it's a fairly rural location this is quite unusual. We looked out
    and there was a group of people in hi-vis jackets installing fibre on
    the posts down our road. It was well after 23:00.

    I guess they had decided, given that our road is a no through road,
    that they would block the road only when it was very unlikely that
    people would want to get past.

    Most of the rest of the village has been provided with CityFibre from
    a trench dug in or alongside the road. Our little private road is
    concrete though so I guess they decided that using the existing
    overhead poles would be easier. There is now a little label at the
    bottom of the pole saying "Cityfibre 13/8/2925". At the top of the
    pole is a beige box with the fibre connection going in and out and a
    drop wire down the pole with the end looped up at the moment.

    Does anyone know:-

    1 - Will they overhead the fibre into our house (it would be much
    easier, existing FTTC comes from the same pole into my first floor
    study)?

    2 - How soon is a connection likely to be available (via IDnet or
    AandA)?
    --
    Chris Green
    -+
    --- Synchronet 3.21a-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.telecom.broadband on Thu Aug 14 13:41:01 2025
    From Newsgroup: uk.telecom.broadband

    Chris Green <cl@isbd.net> wrote:
    Last night after we had gone to bed we heard people talking outside,
    as it's a fairly rural location this is quite unusual. We looked out
    and there was a group of people in hi-vis jackets installing fibre on
    the posts down our road. It was well after 23:00.

    I guess they had decided, given that our road is a no through road,
    that they would block the road only when it was very unlikely that
    people would want to get past.

    Most of the rest of the village has been provided with CityFibre from
    a trench dug in or alongside the road. Our little private road is
    concrete though so I guess they decided that using the existing
    overhead poles would be easier. There is now a little label at the
    bottom of the pole saying "Cityfibre 13/8/2925". At the top of the
    pole is a beige box with the fibre connection going in and out and a
    drop wire down the pole with the end looped up at the moment.

    Does anyone know:-

    1 - Will they overhead the fibre into our house (it would be much
    easier, existing FTTC comes from the same pole into my first floor
    study)?

    2 - How soon is a connection likely to be available (via IDnet or
    AandA)?


    1. A colleague who had CF on poles had an overhead drop wire fitted to the house. Well, drop fibre.
    2. Hard to say. IDnet seem to have direct communication to CF, so best to
    ask them to find out.

    --- Synchronet 3.21a-Linux NewsLink 1.2
  • From Andy Burns@usenet@andyburns.uk to uk.telecom.broadband on Thu Aug 14 16:00:01 2025
    From Newsgroup: uk.telecom.broadband

    Chris Green wrote:

    there was a group of people in hi-vis jackets installing fibre on
    the posts down our road. It was well after 23:00.

    I guess they had decided, given that our road is a no through road,
    that they would block the road only when it was very unlikely that
    people would want to get past.

    An old friend of mine works for OpenReach, and says that BT/OR can't do
    that sort of thing, they have to arrange partial road closure/traffic
    lights, but the little-boys just do it and get away with it ...

    --- Synchronet 3.21a-Linux NewsLink 1.2
  • From Theo@theom+news@chiark.greenend.org.uk to uk.telecom.broadband on Thu Aug 14 16:18:43 2025
    From Newsgroup: uk.telecom.broadband

    Chris Green <cl@isbd.net> wrote:
    2 - How soon is a connection likely to be available (via IDnet or
    AandA)?

    Very much depends on how much of the network has also been installed. They
    may have installed the 'branches' in the street but the 'trunk' down the
    road may not have been finished yet.

    Theo
    --- Synchronet 3.21a-Linux NewsLink 1.2
  • From Peter Johnson@peter@parksidewood.nospam to uk.telecom.broadband on Fri Aug 22 17:27:22 2025
    From Newsgroup: uk.telecom.broadband

    On Thu, 14 Aug 2025 13:56:27 +0100, Chris Green <cl@isbd.net> wrote:



    Does anyone know:-



    2 - How soon is a connection likely to be available (via IDnet or
    AandA)?

    Keep an eye on the CF website: https://cityfibre.com/