From Bob La Londe@none@none.com99 to rec.crafts.metalworking on Sun Jul 20 12:27:22 2025
From Newsgroup: rec.crafts.metalworking
Ordinarily I do other chores around the shop between tool changes and designing the next job, but not the last few weeks.
I am weeks behind due to the other things I have had to work on. It
took me almost two weeks to get everything I needed to install the new
air dryer. I'd already been running slow for a few days as I assembled
an outdoor shade structure for metal storage and cutting area, and took
care of other chores that had been piling up... like cleaning up the
area for the shade, and of course testing some prototype fishing lures.